Negotiated Report (Representations made) 131998 981211 5
a. a design prepared by a suitably qualified person (RPEQ) that is to an acceptable
standard to cater for a HRV, 14.5m rigid vehicle (i.e., bus) and appropriate fire-fighting
appliances in the event of a fire emergency only.
b. a design that allows for unbroken access for a HRV, 14.5m rigid vehicle (i.e., bus) and
appropriate fire-fighting appliances through the site (i.e., from “Road 176” to all parking
and manoeuvring areas and through to Kabi Road);
c. a design that includes passing bays and turning areas;
d. the emergency route, all internal roads and associated manoeuvring areas must not
exceed a gradient of 12.5%;
e. the emergency route must have a maximum cleared width of 10.0 metres and a
minimum cleared width of 6.0 metres; and
f. the upgrades to “Road 176” and associated drainage infrastructure, which must be
maintained by the applicant during the life of the development.
g. Consultation must occur with the existing resident(s) that access “Road 176” in relation
to the proposed works.
3. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme. The
requested changes to the conditions do not raise any significant issues and are therefore
supported. The application is therefore recommended for approval.
The report is provided in accordance with Section 76 of the Planning Act 2016.
RECOMMENDATION
With regard to Application No. 131998.981211.5 and the representations made, Council on 14
April 2025 decided to:
A. Agree to amend conditions 12, 57, 58, 66, 68, 76, 81, 86, 97, 98 to read as follows:
12. A contribution toward roadworks external to the development site in the Cootharaba Road
catchment shall be paid prior to the commencement of the Integrated Permaculture Designed
Organic Orchard and Golf Course Complex. The amount of the contribution as at September
1999 is $100,000 and shall be subject to changes in the Consumer Price Index, All Groups
Brisbane, up until the date of payment.
57. The Group Farm Stay Accommodation and Associated Activities use lapses if the use has
not happened by 7 March 2031 unless an application to extend the currency period is approved by
Council.
58. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below. The plans must be amended to incorporate the
amendments listed within the table below and resubmitted to Council prior to the issue of any
Development Permit for Operational Works
Plan No. Rev. Plan/Document Name Date
A-DA-01.02 09 Existing/Demo Site Plan prepared by 9/12/2024
Elevation Architecture
A-DA-01.04 17 Proposed Development Site Plan 9/12/2024
prepared by Elevation Architecture
A-DA-01.05 09 Permaculture Utilisation prepared by 9/12/2024
Elevation Architecture
Page 10 of 13