Negotiated Report (Representations made) 131998 981211 5

of 13

Page text shows just the words. Original shows the document exactly as it was published.

               Bushfire Hazard Assessment and Management Plan (J001061, v.4) dated 11 September 2024,
               and include, but not be limited to:
               a. a design prepared by a suitably qualified person (RPEQ) that is to an acceptable standard to
               cater for a HRV, 14.5m rigid vehicle (i.e., bus) and appropriate firefighting appliances;
               b. a design that allows for unbroken access for a HRV, 14.5m rigid vehicle (i.e., bus) and
               appropriate fire-fighting appliances through the site (i.e., from “Road 176” to all parking and
               manoeuvring areas and through to Kabi Road);
               c. a design that includes passing bays and turning areas;
               d. the emergency route, all internal roads and associated manoeuvring areas must not exceed a
               gradient of 12.5%;
               e. the emergency route must have a maximum cleared width of 10.0 metres and a minimum cleared
               width of 6.0 metres; and
               f. the necessary upgrades to “Road 176” and associated drainage infrastructure, which must be
               maintained by the applicant during the life of the development.
               g. Consultation must occur with the existing resident(s) that access “Road 176” in relation to the
               proposed works.
               Applicant’s Request
               The applicant has requested existing condition 98 be amended to a much lesser standard
               submitting that their traffic consultants BMC Traffic and Recor Consulting Engineers advised that
               a single lane access track of compacted gravel without passing bays would be appropriate.
               Assessment of Request
               Engineering Assessment:
               The applicant is requesting to construct the Fire Access Trail to a “much lesser standard” following
               advice from their Traffic Engineer who has suggested that “standard road design requirements …
               are not directly applicable for an emergency access road”. The Fire Access Trail must be designed
               to accommodate a HRV, 14.5m rigid vehicle (i.e., bus) and appropriate fire-fighting appliances.
               Engineering does not support the proposed change to “a.” to reduce the standard of the Fire
               Access Trail.
               The request to clarify that the Fire Access Trail is to be used “in the event of a fire emergency only”
               does not take away from the original intent of the condition. Engineering is generally supportive of
               this change to ‘a’.
               Engineering recommends that the request to remove the need to provide passing bays and turning
               areas as part of the Fire Access Trail is not supported. This would be contrary industry standards
               and the recommendations of the Bushfire Report.
               The request to clarify part ‘f’ by the inclusion of the word “necessary” upgrades does not add or
               clarify the original intent of the condition. Engineering is not supportive of this change to “f.”.
               Recommendation
               It is recommended existing condition 98 be amended to read as follows:
                      Fire Access Trail
               98.    The development site must be provided with an Emergency Bushfire Evacuation Route
                      connecting to Council’s “Road 176”. The emergency route is to be used for emergencies only
                      and is not to be used for deliveries or general access.
                      The works must be undertaken in accordance with an Operational Works approval and
                      section 5.5 of North Coast Environmental Services’ Bushfire Hazard Assessment and
                      Management Plan (J001061, v.4) dated 11 September 2024, and include, but not be limited
                      to:


                                                                                                        Page 9 of 13

Document Set ID: 23659436
Version: 9, Version Date: 23/04/2025
Log in to download the original file

Negotiated Report (Representations made) 131998 981211 5.pdf · 176 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.