Negotiated Report (Representations made) 131998 981211 5
As part of the original 1998 approval and prior to the commencement of use, the applicant was
required to upgrade Kabi Road to a nominal sealed width of 6m and a 1m gravel shoulder either
side, for a total carriageway width of 8.0 metres. This complies with Council’s PSP6 Engineering
Design Standards for a Local, Rural Road. The Traffic Memorandum by BMC assumes these
works were completed but aerial imagery suggests this is not the case.
The Traffic Memorandum prepared by BMC Traffic reports that the reduced scale of the
development will generate an overall reduction in vehicles per day (vpd) on Kabi Road. The
reported peak, repeatable 85th percentile event is now reduced from 167 to 97.3 vpd.
This reduction in vpd lowers the prescribed standard of Kabi Road. The matter has been referred
to Infrastructure Planning, Design and Delivery who, in conjunction with Engineering, are generally
accepting of the rationale to avoid the widening as described by Austroads’. However, Kabi Road
does not comply with the originally imposed Condition 13 and still proposes to intensify the use of
Kabi Road by generating additional passenger bus (and other ‘heavy’ vehicles) movements.
With Infrastructure Planning, Design and Delivery’s support, Engineering is generally willing to
accept a reduction to the extent of upgrades to Kabi Road. The upgrades must generally comply
with PSP6 Engineering Design Standards, Condition 13 and minimise the risk for conflict between
passenger and ‘heavy’ vehicles. It is recommended that, at a minimum, Kabi Road is upgraded to
allow for safe passing opportunities by providing a nominal carriageway width of 8m and a minimum
sealed lane width of 6m.
Additionally, Engineering recommends that the requirement to extend the existing culvert is
removed as it could be considered unreasonable due to the reduced extent of upgrades to Kabi
Road.
Recommendation
It is recommended existing condition 97 be amended to read as follows:
External Works – Kabi Road
97. Prior to the commencement of the Group Farm Stay Accommodation use Kabi Road must be
upgraded for the full length of the road (i.e., between 59 Kabi Road and Cootharaba Road). The
works must be undertaken in accordance with an Operational Works approval, be generally in
accordance with Austroads’ A Guide to Road Design Part 3, sections 5, 6 and 8 of BMC Traffic’s
Traffic Engineering Assessment Report (Doc ID: 22354477) dated 22 March 2023, The Noosa
Plan 2020 – PSP6 Engineering Design Standards for a “Rural, Local” road, and include, but not
be limited to:
a. a design prepared by a suitably qualified person (RPEQ);
b. a combined sealed traffic lane width of 6.2m (2 x 3.1m) 6.0m;
c. a gravel shoulder width of 1.0m (with a minimum shoulder sealed width of 0.5m);
d. a pavement design suitable to cater for heavy vehicles (i.e., rigid vehicles, buses, etc.);
e. all associated drainage infrastructure (i.e., table drain, culvert, etc.);
f. the continuation of the existing stormwater box culvert to allow for the required carriageway
width deleted.;
g. considerations to the existing residential driveway crossovers; and
h. a sealed turnaround facility sufficiently sized to accommodate a 3-point turn manoeuvre of a
heavy rigid vehicle (HRV) located at the end of the road.
Existing Condition 98
98. The development site must be provided with an Emergency Bushfire Evacuation Route
connecting to Council’s “Road 176”. The emergency route is to be used for emergencies only and
is not to be used for deliveries or general access. The works must be undertaken in accordance
with an Operational Works approval and Section 5.5 of North Coast Environmental Services’
Page 8 of 13