Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2016008949 DECISION NOTICE - Signed

Attached to the e-mail Operational Works Application OPW16/0338.

of 16
                                                                Conditions

  General Conditions
  This approval authorises the connection of network infrastructure and/or property services infrastructure at
  Lot 1 RP73080 & Lot 10 SP236319 to Unitywater’s infrastructure subject to the following conditions.


  General Condition                                                                                                    Timing

  GEN
            When approval lapses
   1
            Ensure the water connection aspects of this water approval are carried out                                 At all times.
            within 4 years of the date of this water approval taking effect.


  Connections Approvals General Conditions                                                                             Timing

  CAG
            Approved demand
   2
            Do not exceed the following approved additional demand for the                                             To be
            development:                                                                                               maintained at all
            Water Supply: 9.2 equivalent persons, water                                                                times.
            (Based on 683m2 [email protected] equivalent persons water / 100m2 GFA)
            Sewerage: 10.6 equivalent persons, sewerage
            (Based on 683m2 [email protected] equivalent persons sewer / 100m2 GFA)
            Where the equivalent person rate is determined in accordance with
            Unitywater’s Schedule of Works.
  CAG
            Damage to existing services and assets
   3
            Notify Unitywater about any damage caused to existing water supply                                         At all times
            and/or sewerage services and assets above or below the ground and                                          during
            repair any damage to the service or asset to the same standard or better                                   construction and
            as existed before the damage occurred. Notification to Unitywater and                                      until works are
            repairs are to be done as soon as reasonably possible.                                                     accepted ‘Off-
            Any repair work proposing to alter or affect the alignment or level of                                     Maintenance’.
            existing water supply and/or sewerage services and assets must first be
            referred to Unitywater for approval.
  CAG
            Existing services alterations/relocations - cost
   4
            Carry out any change to Unitywater’s existing infrastructure authorised by                                 At all times
            this approval at no cost to Unitywater.                                                                    during
                                                                                                                       construction and
                                                                                                                       until works are
                                                                                                                       accepted ‘Off-
                                                                                                                       Maintenance’.




                                                                                                                                           Page 2 of 16
Unitywater is a statutory authority that provides water and sewerage services for the                           Unitywater has certification to
                                                                                                                OH&S ISO 4801:2001 Reg No 4260
Moreton Bay, Sunshine Coast and Noosa Council areas.                                                            Environmental ISO 14001:2004 Reg No 4259
                                                                                                                Quality Systems ISO 9001:2008 Reg No 4258

                                                     Revision No: 2                Effective Date: 19/02/2015            Next Review Date:19/02/2018

Log in to download the original (2016008949 DECISION NOTICE - Signed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.