               69.    Vehicular access arrangements must be varied to allow for an alternative access
                      arrangement for northern vehicle access to the site from Goodchap Street. The
                      alternative access arrangement shall be generally in accordance with Drawing No.
                      17548-C003 Rev B prepared by TOD Noosa dated 14 September 2018. The works shall
                      include but not be limited to:-
                      i.      The linemarking necessary to provide the right turn lane and
                              associated medians,
                      ii.     The direction linemarking within the existing access,
                      iii.    The widening of the current vehicle crossover, and
                      iv.     Any works associated with the existing Telstra pit to the satisfaction of Telstra.
                              Suitable certification from Telstra shall be submitted to Council prior to the
                              commencement of any works and at the completion of the works.
                      Further, a schedule of works, specifications and plans detailing this work shall be
                      prepared and submitted to Council for approval as part of an application for Operational
                      Works
                      Pedestrian Access – Stage D
               70.    The pedestrian bridge (as annotated on the approved plans) cannot be constructed until
                      a road closure approval has been obtained from the Department of Natural Resources
                      and Mines. Council’s consent is to be obtained prior to the application being lodged with
                      the Department.
                      Stormwater Management – Stages C & D (Lot 3 RP264909)
               71.    The stormwater management design must be submitted with an Operational Works
                      application and must demonstrate that the bioretention basin will only receive stormwater
                      flows from catchments the bioretention basin is modelled to treat for water quality
                      improvement purposes (i.e. Sub 2 as detailed on Figure 4 in the Stormwater Management
                      Plan for Lot 4 Good Chap Street Noosaville by Aquaintel dated 25 June 2017). Any detention
                      area required for catchments that are not modelled to be treated by the bioretention basin,
                      must be redirected around or under the bioretention basin.
               72.    Prior to commencement of use of any stage serviced by a stormwater quality treatment
                      device, such as a bioretention basin, the Community Management Statement must be
                      updated to identify and schedule the maintenance requirements for the stormwater quality
                      treatment device asset for that relevant stage.
               73.    Vegetated stormwater quality treatment infrastructure must be maintained in accordance with
                      the manufacturer’s specifications or for vegetated stormwater quality improvement assets,
                      the Water by Design Guideline for Maintaining Vegetated Stormwater Assets
                      Construction Management Plan – Stages C & D
               74.    A Construction Management Plan must be submitted to Council prior to a pre-start
                      meeting and must specifically address the following:
                      a.      Traffic Management during all aspects of the construction phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction
                              ii.      Adequate parking arrangements for patrons utilising the site and construction
                                       workers
                              iii.     Proposed fencing to the site during the construction phase of the development
                              iv.      No queuing of trucks is permitted on Goodchap St or Eumundi Noosa Road,
                                       especially prior to 7.00am. Further parked trucks must have engines turned off
                      b.      Maintenance and protection of the adjoining Lake Doonella Bush Reserve


                                                                                                       Page 11 of 18
Document Set ID: 22465906
Version: 7, Version Date: 22/06/2023
Log in to download the original file

Decision Notice - Minor Change - 132007 12 9 [As Published].pdf · 339 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.