Original source · versioned page text
Decision Notice - Minor Change - 132007 12 9 [As Published]
Car Parking
Off Street
13. The development shall provide car parking spaces on the site at a minimum rate of 369 car
parking spaces (including 40 parking spaces for the childcare centre) for Stages A, B, C &
E, with a total of 403 car parking spaces at the completion of Stage D (refer Site Plan DA
01F). Provision for 16 motorcycle or scooter park spaces must be included in the total number
of car spaces.
14. Any new kitchen, laundry and bathroom fittings are to comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products
- Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage
Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per
min. Dishwashers and washing machines are excluded from this requirement.
15. Deleted.
16. The development shall be undertaken in accordance with the recommendations of the
Acoustic Report prepared by TTM Consulting (SC) Pty Ltd.
17. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
must be submitted, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
18. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval to effect compliance with conditions.
19. The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses
if the use has not happened by 17 February 2014, unless an application to extend the
currency is approved by Council.
20. The developer must obtain all of the other Development Permits referred to in the
Decision Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Reconfiguring a Lot
21. The lot reconfiguration shall be in accordance with plan SP196846 as submitted by
Jones Flint & Pike Pty Ltd except as modified herein.
22. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form
with the fees prescribed in Council's adopted fee schedule.
23. Pursuant to Section 3.7.3(3)(c) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured shall
be paid prior to endorsement of the Plan of Survey.
24. The applicant shall provide a 2m by 2m truncation on each corner of Lot 4 adjacent to
Lot 1 on RP802360 on either side of Council's pathway to assist service vehicle access.
An underground electricity service shall be provided to service all parts of Lot 4 if not
already provided. The service shall be provided before the use commences.
25. All parts of lot 4 shall be serviced by water supply appropriate for necessary
requirements, such as firefighting. The service shall be provided before the use
commences.
Vehicle Access
26. The eastern site access intersection shall be modified to increase the length of the
parallel right turn storage lane to at least 20 metres.
Page 4 of 18
Document Set ID: 22465906
Version: 7, Version Date: 22/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original