Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                                 Acceptable Outcomes
      (e)   allow for space and landscaping to be provided between
            buildings including adequate area at ground level for          AO10AO11.2
            landscaping with trees, shrubs, outdoor living and             The front 6 metres of the property is landscaped open
            utilities;                                                     space, provided that uncovered visitor parking, or swimming
                                                                           pools protruding no more than 1 metre above the ground
      (f)   be consistent with the predominant character of the            level, can be as close as 2 metres from the front boundary.
            surrounding area; and
      (g)   protect the natural character and avoid adverse impacts        AO11.3
            on ecologically important areas such as national parks,        Relocatable homes are set back not less than:
            waterways and wetlands.                                        (a) 6 metres from a road frontage;
                                                                           (b) 1.5 metres from any other site boundary; and
                                                                           (c) 3 metres from an internal road

                                                                           AO10.3AO11.4
                                                                           Buildings and structures on premises with frontage to the
                                                                           Noosa River system are set back not less than 10 metres from
                                                                           mean high water spring as shown in Figure AP3­15A.


      AO10.4Setback to a watercourse in the Noosa Waters estate, AO12
      Noosaville                                                       For premises adjoining a watercourse within the waterways of
      BuildingsPO12                                                    Noosa Waters estate areno setbuilding backwork, filling or
      Land adjoining the revetment wall and for a width of 4.5 metres excavation works occurs within 4.5 metres from the centre line
      serves flood detention and amenity functions, free of structures of the top of the concrete revetment wall.
      onand impervious surfaces.
                                                                       Editor's note—refer;refer to figure 6 6.3.1.5
       PO13                                                           AO13.1
      The flood detention and amenity functions of the area adjoining A minimum of 25% of the area within 4.5 metres of the
      the Noosa Waters revetment wall are retained and enhanced by revetment wall is gardens planted with shrubs and small trees
      ensuring:                                                       with a mature height of 3 metres or less.
      (a)   works do not protrude through a batter line of 1:4.5
            measured from the centre line of the revetment wall;           AO13.2
                                                                           The ground surface within the first metre of the revetment wall—
      (b)   there is no additional load placed on the revetment wall;
                                                                           (a)   is grass or ground cover; and
      (c)   works do not pose a risk to the membrane adjoining the
            revetment wall;                                                (b)   does not include shrubs.

      (d)   of the watercourse and surrounding land uses is not
                                                                       AO13.3
            adversely affected by development (building works, filling
                                                                       Side boundary fences within 4.5 metres of the revetment wall
            or excavation) ensuring:
                                                                       taper down to a maximum height of 1.2 metres at the revetment
            (i)    the area is predominantly soft landscaping;         wall and no more than 1.5 metres at a distance of 2.25 metres
            (ii)   a maximum of 25% of the area is impervious;         from the revetment wall.
            (iii)    dominant impervious areas and masonry
                     retaining walls are avoided;                          AO13.4
                                                                           No shore side anchor points are within 4.5 metres of the
            (iv)     retaining structures and the like are light weight,   revetment wall.
                     low rise and screened by landscaping;
            (v)      natural materials such as timber or rock are used
                     rather than manufactured materials;
            (vi)     the acoustic privacy and access to sunlight of
                     surrounding development is protected;
            (vii)    views are not impeded; and
            (viii)   shore side anchor points are avoided.


     Table 6.3.2.3 ­ Criteria for assessment (part)

      Performance Outcomes                                                 Acceptable Outcomes
      Design

**FINAL DRAFT ­ Post Consultation 2019**                                                                                              Page 5 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.