Appendix D - Sales Office Approval

Attached to the e-mail Commercial Business Type 2 Medical (Doctor's Practice) - MCU18/0195.

of 16

Page text read automatically using OCR, there may be inaccuracies

Noosa Council documents




                                                                                                      MCU15/0119


                              c.       The latest version of the Healthy Waterways document “Water Sensitive
                                       Urban Design Technical Design Guidelines for South East Queensland” for
                                       all water quality devices to be constructed on site
                              Driveways, Carparking and Pavement Design
                      12.     Driveway crossover (extending from the road formation to the property boundary)
                              must be constructed:
                              a.       With a sealed or bonded surface such that loose surface material is not
                                       transported on to Pearsons Road
                              b.       To not affect the drainage patterns or cause additional ponding of surface
                                       water in the Pearsons Road road reserve
                      13.     Pavement for the parking area must be constructed with an all-weather surface
                              that is suitable and stable for the expected length of use. The design for privately
                              owned works must be undertaken in accordance with the relevant standards, the
                              structural integrity of the driveway and car parking area will remain the
                              responsibility of the property owner/developer.
                              Works within Road Reserve and Reinstatement Works
                      14.     Safe pedestrian access on all streets in the vicinity of the development must be
                              maintained at all times. Should footpath/road closures be necessary to carry out
                              construction works, Council’s Engineering Officer must be notified prior to the
                              proposed closure and all requirements complied with.
                              Earthworks
                      15.     All earthworks must be undertaken in accordance with the relevant provisions of
                              AS 3798 Guidelines on Earthworks for Commercial and Residential Development.
                      16.     All Earthworks and construction works must be carried out taking into
                              consideration the protection of any existing above and below surface services.
                              Stormwater Drainage
                      17.     Stormwater runoff from the development must be disposed of on-site without
                              causing scour or damage to the subject site or any adjoining property
                              Environment – Erosion & Sediment Control
                      18.     Prescribed Water Contaminants (as defined in the Environmental Protection Act
                              1994) must not be released from the site or to waters within the site, or be likely to
                              be released should rainfall occur, unless all reasonable and practicable measures
                              are taken to prevent or minimise the release and concentration of contamination.
                      19.     Erosion and sediment control measures must be installed and maintained to
                              minimise erosion on the site and to minimise the export of sediment and
                              associated pollutants from the site. The erosion and sediment control measures
                              must be designed, installed and maintained in accordance with current best
                              practice standards.
                              Damage to Services and Assets
                      20.     Any damage caused to existing services, streetscape and assets as a result of the
                              development works must be repaired at no cost to the asset owner at the following
                              times:
                              a.       Where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or



                                                                                                            Page 3 of 8


Document Set ID: 20038633
Version: 1, Version Date: 14/03/2016                                                                 Print Date: 14 March 2016, 4:33 PM

Log in to download the original (Appendix D - Sales Office Approval.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.