Original source · versioned page text
Appendix D - Sales Office Approval
Attached to the e-mail Commercial Business Type 2 Medical (Doctor's Practice) - MCU18/0195.
Noosa Council documents
MCU15/0119
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
CO-SO-001 A Site Plan, drawn by Palm Lake Works 21/10/2015
CO-SO-001 A Floor Plan/Elevations, drawn by Palm 21/10/2015
Lake Works
Nature and Extent of Approved Use
3. The approved use must not operate outside the hours of 8am to 6pm Monday to
Sunday.
4. The total number of advertising signs provided on the site and associated with the
estate sales office must not exceed one, having a maximum display area of 3m2
and not involving bunting, illumination or motion. Any advertising sign must be
contained entirely within the boundaries of the subject site.
5. The total number of employees present on the site at any one time must not
exceed four.
6. The approved use must cease operating four years from the date of this approval
and the building must be removed within 30 days. The site is to be rehabilitated by
turfing and landscaping as necessary.
Landscaping
7. Screening vegetation must be planted along the proposed estate sales office
frontage to Pearsons Road in accordance with Council’s Planning Scheme Policy
PSP3 Landscaping Plants and Guidelines. The landscaping shall include a
minimum of 8 small shrubs.
Setbacks
8. The estate sales office must have a minimum setback of 10m from Pearsons Road
(road reserve).
Engineering
9. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement
of works.
10. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to
assets must be repaired immediately where it creates a hazard to the community.
In circumstances where the damage does not create a hazard to the community, it
must be repaired immediately on completion of the works associated with the
development.
11. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
Page 2 of 8
Document Set ID: 20038633
Version: 1, Version Date: 14/03/2016 Print Date: 14 March 2016, 4:33 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix D - Sales Office Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.