ORDINARY MEETING AGENDA                                                      21 FEBRUARY 2019


              21.3. The works (Kauri Street, Olivine Street and the intersection) must include
                    suitable drainage structures and stormwater collection to ensure that runoff
                    from the road formation is collected, controlled and directed to ensure that
                    the roadway is safely trafficable and must be in compliance with the relevant
                    sections of the Queensland Urban Drainage Manual (QUDM).
              21.4. As part of the application for operational works, the developer’s civil
                    engineering consultant shall investigate and report on the possible
                    deficiencies in the existing stormwater system, to the western end of Agate
                    Street and including inspection by closed circuit television (CCTV) of the
                    existing stormwater system. The developer is required to rectify any deficient
                    stormwater pipes or structures extending from the development frontage
                    down to and including the manhole downstream of the 600x1200 box culvert
                    which crosses Kauri Street.
              21.5. The design and construction of all works shall be carried out in accordance
                    with Council’s Planning Scheme Policy PSP05 – Engineering Design
                    Standards – Roads, Drainage and Earthworks and the applicable
                    engineering standards current at the time of construction.
                    The above condition is imposed pursuant to s145 of the Planning Act 2016
                    being non-trunk infrastructure.
        22.   All associated and ancillary work including pavement correction to the existing
              pavement, drainage works, modification of the footpath, and adjustments to the
              existing infrastructure must be undertaken to complete the roadworks widening and
              must be carried out in accordance with the applicable engineering standards and
              the tree retention requirements of this approval.
              In this regard a schedule of works, specifications and plans detailing this work shall
              be prepared and submitted to Council for approval prior to obtaining a
              Development Permit for Operational Works
        23.   The applicant must truncate the boundaries at the intersection of Kauri Street and
              Olivine Street and dedicate the truncated section as “Road”. The truncation must
              be in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering
              Design Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication
              must be undertaken at no cost to Council.
              Pathway and Frontage Works
        24.   A new 2.0m wide concrete path must be constructed along the Kauri Street and
              Olivine Street frontages of the site in accordance with an Operational Works
              approval and to a desirable and smooth alignment for the comfort of users and
              protection of trees identified in this permit for retention. The new path must be in
              compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
              Construction Details.
              The works must include a sufficient number of pram ramps to be provided near the
              intersection of Kauri Street and Olivine Street where identified by Council to
              connect to existing and proposed pathways network.
              The above condition is imposed pursuant to s145 of the Planning Act 2016 being
              non-trunk infrastructure.
        25.   All paths, pram ramps, driveways and parking areas shall be designed and
              constructed to ensure pedestrian safety using non-slip materials, to produce an
              evenly graded surface finish, and to be in accordance with the Disability
              Discrimination Act 1992 and Australian Standard 1428.1 Design for Access &
              Mobility.



                                                                                    Page 17 of 24
Log in to download the original file

2019-02-21 Ordinary Meeting Agenda(PDF, 606KB).pdf · 621 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.