Original source · versioned page text
2019-02-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 FEBRUARY 2019
21.3. The works (Kauri Street, Olivine Street and the intersection) must include
suitable drainage structures and stormwater collection to ensure that runoff
from the road formation is collected, controlled and directed to ensure that
the roadway is safely trafficable and must be in compliance with the relevant
sections of the Queensland Urban Drainage Manual (QUDM).
21.4. As part of the application for operational works, the developer’s civil
engineering consultant shall investigate and report on the possible
deficiencies in the existing stormwater system, to the western end of Agate
Street and including inspection by closed circuit television (CCTV) of the
existing stormwater system. The developer is required to rectify any deficient
stormwater pipes or structures extending from the development frontage
down to and including the manhole downstream of the 600x1200 box culvert
which crosses Kauri Street.
21.5. The design and construction of all works shall be carried out in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks and the applicable
engineering standards current at the time of construction.
The above condition is imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
22. All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure must be undertaken to complete the roadworks widening and
must be carried out in accordance with the applicable engineering standards and
the tree retention requirements of this approval.
In this regard a schedule of works, specifications and plans detailing this work shall
be prepared and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works
23. The applicant must truncate the boundaries at the intersection of Kauri Street and
Olivine Street and dedicate the truncated section as “Road”. The truncation must
be in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering
Design Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication
must be undertaken at no cost to Council.
Pathway and Frontage Works
24. A new 2.0m wide concrete path must be constructed along the Kauri Street and
Olivine Street frontages of the site in accordance with an Operational Works
approval and to a desirable and smooth alignment for the comfort of users and
protection of trees identified in this permit for retention. The new path must be in
compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
Construction Details.
The works must include a sufficient number of pram ramps to be provided near the
intersection of Kauri Street and Olivine Street where identified by Council to
connect to existing and proposed pathways network.
The above condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure.
25. All paths, pram ramps, driveways and parking areas shall be designed and
constructed to ensure pedestrian safety using non-slip materials, to produce an
evenly graded surface finish, and to be in accordance with the Disability
Discrimination Act 1992 and Australian Standard 1428.1 Design for Access &
Mobility.
Page 17 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.