Original source · versioned page text
2022-07-18 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 JULY 2022
Ninox Robotics Pty Ltd t/as Ninox Robotics
OroraTech GmbH
Arvind Satyam (Pano AI)
Redeye Apps Pty Ltd t/as RedEye
Ripper Corporation Pty Ltd
Skybase Limited t/as Skybase
The category split nominated by suppliers to this ROPS was as per the table below.
04.
01. Bushfire 02. Bushfire 03. Aerial Uncrewed
Respondent Name / Category
Prediction Detection Operations Firefighting
Solutions
3FB Aerworx Pty Ltd YES
Meshed Pty Ltd YES YES
Fireball International Pty Ltd t/as
YES
EXCI.AI
Bredon Kynnie McAtee t/as Image
YES YES
Knowledge (Mayday.ai GmbH)
Mirragin RAS Consulting Pty Ltd t/as
YES YES YES YES
Mirragin Consulting
N5 Sensors, Inc. YES
Ninox Robotics Pty Ltd t/as Ninox
YES
Robotics
OroraTech GmbH YES YES
Arvind Satyam (Pano AI) YES
Redeye Apps Pty Ltd t/as RedEye YES
Ripper Corporation Pty Ltd YES YES YES
Skybase Limited t/as Skybase YES YES
4. Next Steps
Contract documents shall be issued to the suppliers recommended and approved for inclusion to
the ROPS, and all suppliers will be required to register and maintain their details in the
VendorPanel e-portal to ensure licences and other qualifications are maintained.
The ROPS is a register of suppliers that are pre-qualified and capable of responding to the
Council’s requirements in a timely manner; and where the Council can either:
directly engage a supplier from the ROPS on an as required basis utilising the rates provided
within the Schedule of Pricing or on other rates as agreed; or
request quote(s) from one or more suppliers on the ROPS on an as required basis for fixed
term services utilising the rates provided within the Schedule of Pricing or on other rates or
lump sum price as agreed.
Inclusion onto this ROPS does not provide a guarantee of work to suppliers during the term of this
Contract.
Suppliers shall be engaged under this ROPS applying the Panel Management Plan as a guide.
The Panel Management Plan is used by contract managers/administrators to document all key
Page 7 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.