Minor Change - MCU17 0568 01 & OPW17 0602 01 [As Published]
OPERATIONAL WORKS - OPW17/0602
APPROVED PLANS
28. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
27281-OW5 B Operational Works: Driveway & Access, 13.02.2018
prepared by SCG Consulting Engineers
27281-SW1 C Operational Works Stormwater Management, 22.02.2018
prepared by SCG Consulting Engineers
PRIOR TO COMMENCEMENT OF WORKS
Engineering
29. At least 5 working days prior to any works commencing, written advice must be provided to
Council detailing:
a) The name, contact details and ACN for the supervising Registered Professional
Engineer of Queensland (RPEQ) and Principal Contractor.
b) Proposed dates for commencement and completion of construction.
30. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
31. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart meeting*. The contact number to arrange a prestart meeting is 5329
6244. The prestart meeting must include the relevant parties for the following aspects of the
works:
a) Civil engineering and stormwater drainage works.
b) Landscape works.
c) Erosion and sediment control works.
* (Refer to Advisory Note)
32. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer at the
“prestart” meeting.
33. A detailed condition report including photographs of all frontages of the site must be
completed and submitted to Council prior to the prestart meeting.
34. A condition report including photographs of all fences and retaining walls bordering the site
and any buildings, structures, pathways, landscaping features etc on adjoining properties
that could potentially be impacted on by the proposed earthworks and construction works
must be completed and submitted to Council prior to the prestart meeting.
35. A Construction Management Plan must be submitted to Council for approval prior to the
prestart meeting and must specifically include/address the following:
a) Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures to be installed prior to construction.
Page 5 of 15
Document Set ID: 22608628
Version: 4, Version Date: 05/10/2023