Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE Table 11: Detention Tank A Parameters 2 Detention Tank Surface Area 100 m Detention Tank Invert Level 9.14 m Detention Tank Height 1.26 m Low Flow Outlet Pipe Diameter 300 mm @ Invert of tank Low Flow Orifice Diameter 210 mm High Flow Orifice Diameter 110 mm High Flow Outlet Pipe Invert Level 9.63 m Over Flow Outlet Diameter 150 mm Over Flow Outlet Pipe Invert Level 9.95 m 3 Detention Volume 126 m The 25 minute design storm was the critical storm event for determining the required volume within the tank. A comparison of the pre development, post development and mitigated flow rates based on the above arrangement is shown in Table 12 followed by the hydrograph in Figure 3 for the critical duration of the Q100 storm event. Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B Table 12: Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B Average Recurrence Interval 2 10 100 DRAINS Pre Development 3 m /s 0.104 0.169 0.277 Flow Rate DRAINS Post Development 3 Flow Rate m /s 0.174 0.280 0.448 Catchment A Q100 DRAINS Mitigated 3 m /s 0.104 0.169 0.277 Development Flow Rate Figure 3: Mitigated Post Development Catchment Q100 Flow Rates Catchment A will be collected by a detention tank to mitigate flows to less than that of the pre development scenario and will discharge to a LPOD on Eumundi Noosa Road. With reference to Figure 3 the detention arrangement can be seen to effectively mitigate the post development flows in all storm events for the proposed site. K4277-0002 14 March 2018 Page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.