Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.

of 37

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

Good Shepherd Lutheran College                                                                  Odyssey Consulting Group
Proposed Unit Development                                                        Conceptual Stormwater Management Plan
Lot 30 on SP170751                                                                                     Project No: K4277
115 EUMUNDI NOOSA ROAD, NOOSAVILLE

        Table 11:      Detention Tank A Parameters
                                                                                                2
          Detention Tank Surface Area                                                   100 m
          Detention Tank Invert Level                                                    9.14 m
          Detention Tank Height                                                          1.26 m
          Low Flow Outlet Pipe Diameter                                       300 mm @ Invert of tank
          Low Flow Orifice Diameter                                                     210 mm
          High Flow Orifice Diameter                                                    110 mm
          High Flow Outlet Pipe Invert Level                                             9.63 m
          Over Flow Outlet Diameter                                                     150 mm
          Over Flow Outlet Pipe Invert Level                                             9.95 m
                                                                                                3
          Detention Volume                                                              126 m
        The 25 minute design storm was the critical storm event for determining the required volume within
        the tank. A comparison of the pre development, post development and mitigated flow rates based on
        the above arrangement is shown in Table 12 followed by the hydrograph in Figure 3 for the critical
        duration of the Q100 storm event.
        Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B
        Table 12:      Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B
                    Average Recurrence Interval                          2                   10                 100
                    DRAINS Pre Development                  3
                                                           m /s          0.104               0.169              0.277
                    Flow Rate
                    DRAINS Post Development
                                                            3
                    Flow Rate                              m /s          0.174               0.280              0.448
                    Catchment A Q100
                    DRAINS           Mitigated              3
                                                           m /s          0.104               0.169              0.277
                    Development Flow Rate




        Figure 3:      Mitigated Post Development Catchment Q100 Flow Rates
        Catchment A will be collected by a detention tank to mitigate flows to less than that of the pre
        development scenario and will discharge to a LPOD on Eumundi Noosa Road. With reference to Figure
        3 the detention arrangement can be seen to effectively mitigate the post development flows in all
        storm events for the proposed site.


K4277-0002                                           14 March 2018                                          Page 9 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.