Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
Good Shepherd Lutheran College Odyssey Consulting Group Proposed Unit Development Conceptual Stormwater Management Plan Lot 30 on SP170751 Project No: K4277 115 EUMUNDI NOOSA ROAD, NOOSAVILLE 3 The hydraulic analysis using the DRAINS model has determined that a minimum of 126 m of storage is required for runoff attenuation and is to be provided in the form of a detention tank located within the open space area. Refer to Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/A) and Odyssey Consulting Group, Stormwater Detention and Bio retention Details (Ref: K4277/P010/A) included as Appendix F, for details of the tank arrangement, indicative location and preliminary stormwater layout. The final location onsite and construction levels will be determined at detailed design stage. A copy of the DRAINS model used in this report can be made available to Council upon request. 5.0 WATER QUALITY ASSESSMENT 5.1 Background The development of land has the potential to increase the pollutant loads within stormwater runoff and downstream watercourses. During the construction phase of the development disturbance to the vegetation on the site has the potential to significantly increase sediment loads entering downstream watercourses. The operational phase of the development will increase the density of residential land use potentially increasing the amount of sediments and nutrients washing from the site. The following sections describe the predicted increase in pollutant loads generated by the proposed development and treatment devices to mitigate the potential increases. In accordance with industry guidelines suspended solids, nitrogen and phosphorus will be targeted for reduction during the operational phase of the development. 5.2 Water Quality Objectives To protect the water quality of the downstream watercourses the following water quality objective has been applied to stormwater runoff from the site in accordance with State Planning Policy. The following load reduction targets must be achieved when assessing the post-developed sites treatment train (comparison of unmitigated developed case versus developed mitigated case): 80% reduction in Total Suspended Sediment (TSS); 45% reduction in Total Nitrogen (TN); 60% reduction in Total Phosphorus (TP); and 90% reduction in litter (sized 5 mm or greater) 5.3 Construction Phase A high risk of stormwater pollution will occur from the site during the construction phase due to erosion and sediment transportation off site to the receiving environment. The majority of this risk results from construction activities disturbing the site and exposing areas of soil to the direct erosive influence of the environment. The following section outlines the procedures necessary to minimise erosion and control sediment during construction in accordance with Department of Environment and Resource Management’s, Urban Stormwater Quality Planning Guidelines, 2010, (DERM USQG). and the Institution of Engineers Australia (QLD) Erosion and Sediment Control Guidelines. 5.3.1 Common Pollutants In accordance with Table 1.1 (DERM USQG, 2010) the following common pollutants have been identified for the Construction Phase of this development. K4277-0002 14 March 2018 Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.