Original source · versioned page text
2018-05-17 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 17 MAY 2018
Submit certification
44 Prior to the commencement of the use certification by a suitably qualified person that
the road tanker delivery stand has been designed, constructed and installed in
accordance with the above requirements must be submitted to Council.
Stage 1 vapour recovery
45 Prior to the commencement of the use construct and install stage 1 vapour recovery
for underground systems storing motor spirit/petrol that has:
a. vapour return lines that return all vapour displaced from the storage tank to the
delivery tanker.
b. a design that prevents the mixing of product in piping common to more than one
tank.
c. vapour-tight couplings on the vapour line that close automatically when
disconnected.
d. incompatible liquid and vapour couplings.
e. a pressure vacuum valve and a 10-millimetre orifice in parallel fitted to the
storage tank vent pipe, or accepted equivalent.
f. the vapour recovery point located within 2 metres of the respective fill point.
Submit certification
46 Prior to the commencement of the use certification by a suitably qualified person that
stage 1 vapour recovery equipment has been constructed and installed in accordance
with the above requirements must be submitted to Council.
Stage 2 vapour recovery systems
47 Prior to the commencement of the use Stage 2 vapour recovery (VR2) equipment shall
be designed and installed in accordance with the following:
a. VR2 equipment shall be installed on all dispensers for motor spirit/petrol in
compliance with NSW DECC Standards and Best Practice Guidelines for Vapour
Recovery at Petrol Service Stations and the Storage and Dispensing of
Petroleum Products Planning Scheme Policy (2014).
b. VR2 equipment shall be designed and approved by the German TÜV and shall
incorporate a visual indicator that the vacuum operates when fuel is dispensed.
The approval must be in accordance with the provisions of Ordinance on the
Limitation of Hydrocarbon Emission Resulting from the Fuelling of Motor
Vehicles-21, BImSchV (2002).
c. VR2 equipment shall be installed in accordance with the manufacturer’s
specifications by a duly qualified person.
d. VR2 equipment shall be tested to ensure a hydrocarbon capture efficiency must
not be less than 85% vapour recovery to liquid dispensed by volume as
measured using a test for active vapour recovery systems in Verein Deutscher
Ingenieure (VDI) specification 4205. (testing is already required in Certification)
Submit Certification
48 Prior to the commencement of the use VR2 equipment shall be tested by a duly
qualified person in the manner specified in the NSW DECC Standards and Best
Practice Guidelines for Vapour Recovery at Petrol Service Stations. A copy of this
certification shall be provided to Council together with certification demonstrating that
the system has been installed in accordance with the above.
49 Each petrol dispenser fitted with VR2 equipment shall be fitted with a sign stating that
VR2 equipment is in use. Additional signage stating that VR2 equipment is in use shall
be attached to the service station premises.
Page 26 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.