Original source · versioned page text
3836PlanningReport
Attached to the e-mail REC15/0010 Application to Reconfigure a Lot - 1 lot into 2 lots - Email 1 of 2.
The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Specific Outcomes fences, signage and bollards. RO UU 010 The subdivision layout is designed to facilitate linkages with adjoining sites in the immediate area. The existing linkages to adjoining site will remain following the Reconfiguration. O11 Where the lots are to be used for Industrial business or Commercial business uses, the layout provides for appropriate buffer areas, to mitigate possible impacts on nearby residences or other noise sensitive uses. Not applicable. 012 For lots in the Rural Settlement Zone—a sealed access to the nearest urban settlement is available. Not applicable. Water supply for fire fighting 013 An adequate and accessible water supply is provided for fire fighting purposes. Existing reticulated water supply provides fire fighting resource. Energy efficiency 014 The street and lot orientation facilitates the construction of energy efficient buildings that respond to the local climate conditions. AND 015 For residential development, the subdivision design provides for the maximum practicable number of lots with house site areas that— a) maximise solar access to the north in winter; b) minimise solar access to the east and west in the summer; c) maximise access to any prevailing summer breezes; and d) minimise exposure to prevailing winter winds. The proposed lot layout permits the construction of a house that includes energy efficient features and orientation. Infrastructure 016 Each lot is capable of being serviced by appropriate levels of— a) water supply; b) reticulated sewerage; c) stormwater drainage; d) power supply; and e) — telecommunications; AND O17 The design and provision of public services and utilities, including sewerage, water, electricity, street lighting and telecommunication services— a) meets the needs of users; b) ensures health, safety and convenience of the community; c) protects the natural environmental values of the site and surrounds, including visual amenity and native vegetation; d) are cost effective over their life cycle; e) minimises adverse impacts to the environment (including the amenity of the local area) in the short and long term; and f) ensures that the existing systems are The development has water, sewerage, power and telephone services available. The proposal will not require the extension of the reticulation of services; however it will require the installation of new water meter. A stormwater system is also proposed for Lot 2 that includes an on-site infiltration system. 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.