Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

3836PlanningReport

Attached to the e-mail REC15/0010 Application to Reconfigure a Lot - 1 lot into 2 lots - Email 1 of 2.

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Specific Outcomes SOT

upgraded or relocated to be capable of
supporting the proposed development;

AND
0718 Essential public utilities are available and

maintain their function during flood events up to a
1% AEP (1:100 year AR/) flood event.

 

Electricity supply infrastructure

019 Uses and works maintain a safe distance
from electrical infrastructure including
substations, overhead power lines, power poles
and transformers.

Not applicable.

 

Earthworks and stormwater management

 

020 Stormwater run-off is managed so as not to
cause any adverse impacts on the built or natural
environment including changes in quality,
quantity or location of stormwater discharges.

The existing stormwater system will
continue to be utilised following the
Reconfiguration.

 

021 Filling or excavation only occurs where it

does not adversely impact on—

a) watercourses, drainage lines and wetlands;
or

b) vegetation on land identified on Biodiversity
Overlay Maps OM1.1-OM9.1; or

c) water levels on properties elsewhere.

No filling or excavation is required.

 

Landscaping and visual amenity

 

022 Land development responds to the
distinctive landscape character of the site by
utilising the natural features of the site, which
include—

a) watercourses and drainage lines;

b) significant trees;

c) understorey vegetation;

d) rock outcrops; and

e) views.

The natural landform and landscape are
not modified to accommodate the
development.

 

023 Native vegetation, including individual

mature trees are retained, protected, maintained

and supplemented, with particular consideration

given to—

a) roadsides;

b) the amenity of adjoining land uses; and

c) the protection of environmentally sensitive
areas.

The native vegetation located along the
road frontage will be retained with
consideration when constructing the
accesses to the Lots.

 

024 Buildings and other structures do not have
a significant adverse impact upon the visual
amenity of surrounding areas.

Not applicable.

 

Open space

 

025 Public open space is design and located

to—

a) _ provide for a range of recreational settings
and accommodate adequate and
appropriate facilities to meet the needs of
the community;

b) provide a range of safe and easily
accessible recreational opportunities for the
community, except where dedicated for

 

 

The scale of the development does not
require the creation of any additional
public open space.

 

ll

 
Log in to download the original file

3836PlanningReport.pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.