Original source · versioned page text
3836PlanningReport
Attached to the e-mail REC15/0010 Application to Reconfigure a Lot - 1 lot into 2 lots - Email 1 of 2.
The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Specific Outcomes Si conservation purposes; c) contribute to the legibility, accessibility and character of the /ocality; d) create attractive environment settings and focal points; e) facilitate appropriate measures for stormwater and flood management; f) enable the retention and protection of significant vegetation, wetlands, watercourses, drainage lines and other native habitat areas, their associated buffers and linkages/corridors and natural and cultural features; and g) becost effective to maintain. AND 026 The natural environmental and cultural values of land in the Open Space Conservation Zone is not adversely affected by subdivision, and land in freehold tenure in this zone is not subdivided. 027 Adequate land is provided for active The proposed new lots contain sufficient recreation and is of a physical standard and area for recreation. condition suitable for the intended uses and is not subject to physical or other constraints including contamination, biophysical constraints or legislative protection that would encumber it use. Availability and protection of resources 028 Development does not limit the potential for | Not applicable the utilisation of extractive resources by creating conflicts of interest. Road and rail corridors 029 Lots for residential development are not The proposal does not create any subjected to high traffic noise levels from the additional lots in areas of high traffic major road network or rail corridors. noise. Access easements 030 Access easements are in appropriate No access easements are proposed. locations for safe access and egress, and supply appropriate widths and levels of service for the number of vehicles that will utilise them. Traffic 031 Traffic generated by the development is The development will not generate any within the acceptable capacity of external roads substantial increase In traffic. and does not have an adverse impact upon the functioning of the road network. Noosa Trail Network 032 Acomprehensive network of trails is Not applicable. established incorporating road reserves, State forests, Council owned land and private lands consistent with the lifestyle and outdoor recreation needs of the Shire’s residents and visitors. 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.