ORDINARY MEETING MINUTES 26 JUNE 2014
(b) Pumps
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building. All equipment should be
operating at the same time to test the overall noise level created, with the
measurement location at either the residential boundary or outside the most
exposed part of an affected building – whichever is the closest to the
plant/equipment.
30. The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice.
UNITYWATER
31. Reticulated water supply and sewerage must be provided to the development.
32. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. Valves, fire hydrants and sewer
access chambers).
33. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
34. The existing 150mm diameter asbestos concrete watermain in David Low Way
must be replaced for the full frontage of the development site with DICL pipes.
The replacement works must be completed prior to placing construction
materials/site offices over or adjacent to the water main alignment.
35. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Additional water meters must be installed for
each title of a community title or sub-lease scheme. Meters must be Unitywater
approved, installed in accordance with Unitywater requirements and remain
accessible at all times for reading and maintenance purposes.
36. Water meters must be located on alternative boundaries to electrical pillars.
37. Buildings and other structures must maintain a minimum clearance of 1.5
meters from Unitywater sewer mains, and 1.0 meter from a sewer manhole
chamber or sewer inspection opening.
38. The level of the existing sewer manholes must be adjusted to suit the proposed
finished surface levels. Work must be undertaken by Unitywater at the
applicant’s cost or by the applicant’s private contractors following submission to
Council of an Operational Works application and approval of the application.
39. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
40. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 meters from Unitywater water supply and sewerage
infrastructure.
This is not an official copy of Council’s Minutes
Page 13 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.