ORDINARY MEETING MINUTES 26 JUNE 2014
41. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature,
and suitable approved varieties.
42. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do
not form part of the assessment manager conditions:
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council’s Development
Audit & Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
(if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified persons – Landscaping
3. For the purpose of preparing a Landscape Plan, a qualified person is
considered to be a landscape architect, landscape designer and/or horticulturist
with a minimum of 3 years current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The Qleave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. Qleave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
(a) traffic management during all aspects of the construction phase including:
(i) a Traffic Management Control Plan in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
(ii) maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
(iii) proposed fencing to the site during the construction phase of the
development
(iv) provision for worker car parking
This is not an official copy of Council’s Minutes
Page 14 of 33