Original source · versioned page text
25-11-22 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
FORM F — PROTECTIVE MEASURES Purpose: To ensure protective measures are correctly installed to protect the bioretention system while building is occurring in the catchment Protection option adopted (Option 1, 2 or 3) OPTION 1 — SURFACE PROTECTION DURING BUILDING PHASE Continuous sediment fences installed around perimeter of filter media and top of batter. Where landscape works are not to commence immediately then cover batters with filter cloth. Protective covering (filter cloth + 25 mm topsoil + turf) installed across entire filter media area of system. OPTION 2 — BYPASS AND EARLY ESTABLISHMENT Continuous sediment fences installed around perimeter of filter media and top of batter. CHECKED CHECKED SATISFACTORY SATISFACTORY ACTION (IF UNSATISFACTORY) ACTION (IF UNSATISFACTORY) INITIAL INITIAL Where landscape works are not to commence immediately then cover batters with filter cloth. Temporary bund installed (where required) to prevent stormwater runoff from entering bulk of system. Bund keyed into batters of bioretention and crest level higher than pits and weirs. Temporary protective covering (filter cloth + 25 mm topsoil + turf) installed within bunded area. OPTION 3 - SEDIMENT BASIN AND BIORETENTION FUNCTION Continuous sediment fences installed around perimeter of filter media and top of batter Sediment basin installed upstream of bioretention in accordance with either (including hydraulic structures): * WSUD Technical Design Guidelines for SEQ (SEQHWP) + Local erosion and sediment control guidelines or Best Practice Erosion and Sediment Control (IECA, 2008) Suitable access provided to sediment basin for clean out Bioretention system installed downstream of sediment basin Protective covering (filter cloth + 25mm topsoil + | turf) installed across entire filter media areaof =| basin. CHECKED SATISFACTORY HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: Photos attached. Signed by superintendent: Print name: Date: ACTION (IF UNSATISFACTORY) Signed by bioretention designer: Print name: Date: INITIAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.