Skip to the record
The gold standard in government transparency.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FORM G — LANDSCAPE INSTALLATION

Purpose: To ensure the correct plants are supplied, installed and established.

ITEMS

Correct mulch has been supplied
Mulch applied to correct depth and
secured

Supplied plants are correct species

 

Supplied plants are in correct pot sizes
and maturity (300 mm min)

Plants have been installed at correct
planting density (min 6 plants/m?)

As constructed drawings marked up with
final plant species and densities

CHECKED

SATISFACTORY

ACTION (IF
UNSATISFACTORY)

INITIAL

 

Mulch is clear of plant stems by
approximately 50 mm

 

 

 

HOLD POINT: Superintendent AND bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)

 

NB: As constructed drawings and photos attached

Signed by superintendent:
Print name:

Date:

Signed by bioretention designer:

Print name:

Date:

 
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.