Other Change Decision Notice - Council Meeting Decision 131998 981211 5
Any existing fill or natural materials on the development site or with the extent of
approved works external to the site which do not satisfy the Manager-Land
Development’s or a Geotechnical Engineer’s requirements shall be removed and
replaced with suitable material.
25. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test
No. W8A, and all work shall be supervised by a qualified Geotechnical Engineer who
shall certify that fill has been compacted to the required standard.
26. The sewerage system for the club house and any toilet and washing facilities shall be
designed to cater for a minimum hydraulic loading of 4,000 litres per day with peak
loadings above 4,000 l/day being determined from details estimates.
27. Pursuant to Item 15 of Schedule 1 to the Environmental Regulation, 1988, a current
licence shall be held for this sewerage facility from the Environment Protection Agency
(EPA).
28. Disposal of septic and sullage effluent may be by domestic aerated sewerage treatment
plan approved with disposal of final effluent by sub-surface irrigation. This system may
be used in conjunction with an approved composting toilet. Full details shall be
submitted to Council together with a copy of the EPA licence.
The Installation, operation and maintenance of the system shall be in accordance with
all licence conditions.
29. A detailed geotechnical report from a registered professional geotechnical engineer shall
be submitted covering the disposal area for the effluent disposal area. All
recommendations of the geotechnical engineer shall be incorporated in the design of
the disposal area.
30. A final Environmental Management Plan (EMP) covering all aspects of the development
including all operational works as outlined in the Response to Finalised Information
prepared by Gary Dillon and Associates dated 20th April shall be submitted for approval
as part of the application for a development permit for Operational works. All baseline
data required to establish performance benchmarks shall be undertaken and included
in the application.
31. To protect the environment against siltation/sediment export or soil erosion as a result
of this development, The Environment Management Plan shall detail all site control
measures such a silt fencing, sediment control ponds, nutrient stripping ponds. Prior to
commencement of any works, all physical site control measures shall be installed, and
the plan adhered to.
32. All existing noxious weeds, including but not limited to Groundsel bush (Baccharis
halimifolia), Giant Rats Tail Grass (Sporobolus pyramidalis and S. natalensis), and
Salvinia molesta, shall be kept cleared from the development site.
Under State Legislation, Gall Fly (Rhopalomya Californica) is not a recognised means
of control destruction of groundsel bush. Any existing Declared Noxious Plants under
the Rural Lands Protection Act (1985) which have a control category of P2, P3 or P4
shall be controlled in a manner pursuant to the Rural Lands Protection Act (1985).
The notification period to Council of the completion of eradication works shall be a
minimum of thirty (30) days. The Applicant is advised that Council’s Noxious Weeds
Officer will not undertake an inspection the development site until after this notification
period has expired.
33. As part of the application for a development permit for operational works, details for
rehabilitation of the dam and waterway areas by the use of native fauna and flora shall
be included.
Page 5 of 21