Original source · versioned page text
Bushfire Management Plan Review Report_June 2018
Attached to the e-mail URGENT - RAL18/0023 - Essential Bushfire Management Review - Noosa Civic.
Attached to the e-mail FW_ URGENT_ Essential Bushfire Management - Noosa Civic.eml, inside FW Bushfire Management - Noosa Civic.msg.
Attached to the e-mail FW URGENT Essential Bushfire Management - Noosa Civic.msg.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnReport on Review of Bushfire Situation at Noosa Q.I.C.
Civic
Table of Contents
1. Introduction.................................................................................................................. 1
2. Description of the Site ................................................................................................. 1
2.1 History .................................................................................................................... 1
2.2 Development Approval ........................................................................................... 1
2.3 QIC intentions for their Site ..................................................................................... 2
3. Mitigating Requirements to Provide a Safe Environment ............................................ 2
3.1 Existing Compliance ............................................................................................... 2
3.2 Access .................................................................................................................... 3
3.3 Firebreaks and Separation Areas ........................................................................... 4
3.4 Water ...................................................................................................................... 4
3.5 Vegetation Management ......................................................................................... 5
4. Desirable Actions with Timeframes and Budget .......................................................... 5
4.1 Access .................................................................................................................... 5
4.1.1 Hofmann Drive to Walter Hay Drive Connection .............................................. 5
4.1.2 Access Track around Fuel Reduction Unit No. 1 .............................................. 5
4.1.3 Potential Southern Boundary Access ............................................................... 5
4.1.4 Vehicular Access behind Big W ....................................................................... 6
4.2 Fire Line Construction and Vegetation Management .............................................. 6
4.2.1 Access from Hofmann Drive to Walter Hay Drive ............................................. 6
4.2.2 Access Track around Fuel Reduction Unit 1 and 2 .......................................... 7
4.2.3 Management of Vegetation immediately adjoining the Existing Building .......... 7
4.2.4 Fuel Reduction Burning of Unit 1 & 2 ............................................................... 7
4.3 Water ...................................................................................................................... 7
18-028 Report Commercial-in-Confidence
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.