Skip to the record
Every meeting, every word.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                           Location: Taylor Court, Cooroy


Variable         Value           Units
Area:            0.924           ha
Tc               5.9             minutes
C10              0.68            fraction

                                      Table 8 - Rational Method Calculations
                               Variable                1% AEP       10% AEP     39% AEP
                               Freq Factor                1.2         1.0         0.85
                               Intensity (mm/hr)         299.5       205.2       149.1
                               Discharge (m3/s)          0.628       0.358       0.221

The Rational Method Calculations for the 1%, 10% and 39% AEP events generally reflect results
from the XP-RAFTS model. Thus, the XP-RAFTS peak flows have been adopted for hydrological
modelling and detention sizing purposes. A comparison of the results is provided in Table 9.

                           Table 9 - XP-RAFTS and Rational Method Comparison
                                            Rational        XP-RAFTS           Difference
                                AEP          (m3/s)           (m3/s)               (%)
                                 1%          0.628            0.630                0.4
                                10%          0.358            0.357                -0.4
                                39%          0.221            0.219                -1.1

6.5 Design Discharges Unmitigated

6.5.1 Peak Durations

Temporal patterns from Australian Rainfall and Runoff, Volume 2, (1987) have been adopted for
each storm duration. A range of storm durations were analysed to determine the peak discharge
for the catchment. Table 10 presents the flows generated using XP-RAFTS from design storms at
the proposed development site for the existing and developed (unmitigated) case scenarios.

                           Table 10 - XP-RAFTS Design Discharges (Unmitigated)
                                                         Existing                  Developed
                                                                  Peak                       Peak
                                                Critical                       Critical
                  Catchment           AEP                         Flow                       Flow
                                               Duration                       Duration
                                                                 (m3/s)                     (m3/s)
                                      1%           25 min        0.630         15 min       0.724
                      Outlet          10%          60 min        0.357         25 min       0.518
                                      39%          60 min        0.219         25 min       0.331

The peak flows discharging from the site have increased in the developed case scenario due to the
resulting increase in impervious area. To reduce the flows to meet non-worsening conditions, a
detention tank is proposed to increase detention capacity on site and reduce the offsite flows.

6.6     Stormwater Detention

The pre-developed and post-developed (mitigated) conditions were modelled in XP-RAFTS to
demonstrate that stormwater flows will not be increased with the inclusion of an appropriately
designed storage device. The increases in peak flows have been mitigated on site through the use
of a detention tank. Detention provided by the bioretention basin to treat water quality will also be
utilised on site.


Covey Associates Pty Ltd                             9                                           Project No: 161968
Consulting Engineers                                                                                100415 Rpt Iss A
Log in to download the original file

Stormwater Management Plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.