Appendix H - SDAP Response · REC15/0011

Attached to the e-mail REC15/0011 - Development Application for Reconfiguration of a lot - 1 lot into 11 lots plus balance lot - Appendices F, G, H & I email 2 of 2.

of 16

Text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                        Acceptable outcomes                                                  Response      Comment
                                                transport system for the locality, or
                                            (3) use the material for beach nourishment or another
                                                beneficial purpose.
                                            AND
                                            AO4.4 For at-sea disposal of dredged material where the              N/A           The proposed development is not for operational works.
                                            marine spoil disposal site is a retentive (i.e. non-
                                            dispersive) site, the disposal site identified in the dredge
                                            management plan has the capacity to hold and retain the
                                            material within its boundaries during construction and
                                            operation of the development.
                                            Editor’s note: The use of dredged material for a beneficial
                                            purpose could include development of port or other marine
                                            facilities, use for construction or industrial purposes, or use to
                                            create or modify land or waters for an approved environmental
                                            outcome (such as creation of a bird roosting site). Further
                                            information about beneficial uses is contained in the National
                                            assessment guidelines for dredging, Australian Government
                                            Department of Environment, Water, Heritage and the Arts, 2009

Within a wild river area: riparian and wildlife corridor functions
PO5 The clearing of native marine plants    AO5.1 Clearing of marine plants within a wild river area             N/A           The proposed development is not for operational works.
within a wild river area is minimised.      can only occur to the extent of the works, plus the
                                            prescribed area around the development to allow for
                                            maintenance.

PO6 Development within a wild river area    No acceptable outcome is prescribed.                                 N/A            The proposed development is not for operational works.
does not impact fish passage.
PO7 There is no net loss in marine plants   AO7.1 Any marine plant damaged during construction in a              N/A           The proposed development is not for operational works.
beyond the extent of the works in a wild    wild river area is replaced at the completion of the
river area.                                 development with the same species of plant in the
                                            disturbed area outside the footprint of the development.

PO8 Works within a wild river area do not   AO8.1 Works located in tidal waters within a wild river              N/A           The proposed development is not for operational works.
impact on fish habitat values.              area are located, designed, and constructed using
                                            materials to ensure that the activities do not impact on fish
                                            habitat values and function.

Within a wild river area: hydrological processes
PO9 Development within a wild river area    No acceptable outcome is prescribed.                                 N/A            The proposed development is not for operational works.
does not impound natural drainage lines
or flow paths, during both construction


State development assessment provisions                                        Module 10 — Coastal protection               10.1 Tidal works, or development in a coastal management district state code
20 June 2014 V1.4                                                                                                                                                                     Page 14 of 16

Used in these records

About this file

File size
87 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H - SDAP Response.pdf · 87 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.