the design for the connection of the site stormwater drainage to the Council system in Katharina
Street.
2. ASSESSMENT
An assessment in relation to each of the submitted representations is provided below:
Condition 1
Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
21617-C001 B Locality Plan & Drawing 30 January 2023
Index prepared by TOD
Engineers and Project
Management
21617-C100 B Nominal Bulk Earthworks 30 January 2023
prepared by TOD
Engineers and Project
Management
21617-C200 B General Arrangement 30 January 2023
prepared by TOD
Engineers and Project
Management
21617-C201 B Site Sections prepared 30 January 2023
by TOD Engineers and
Project Management
21617-C202 B Roadworks Sections 30 January 2023
prepared by TOD
Engineers and Project
Management
21617-C301 B Stormwater Drainage 30 January 2023
Details and Calculations
prepared by TOD
Engineers and Project
Management
ED 22116 OPW-01 A Sheet Layout Plan 9 November 2022
prepared by Element
Design
As amended by
conditions
ED 22117 OPW-02 A Planting Plan prepared 9 November 2022
by Element Design
As amended by
conditions
Page 2 of 7
Document Set ID: 22424924
Version: 3, Version Date: 15/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) OPW22 0299 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 94 KB (small file)
- File type
No other editions are linked here.