Appendix C - Stormwater Management Plan

Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TfA Project Group Pty Ltd                                                                         Stormwater Management Plan
                                                                                                       Development Application




   Overland run-off from the undeveloped upstream catchment area will be conveyed via spoon drains and gully pits
   installed along the top of a proposed retaining wall located on the Eastern boundary of the proposed development
   discharging to the legal point of discharge on Eumundi Noosa Road. Details of the spoon drain and pit locations,
   as well as hydraulic calculations, will take place in the detail design stage of the development.


   6       WATER QUANTITY ASSESSMENT

   The purpose of this part of the assessment is to investigate whether there is a need to attenuate stormwater flows
   to negate any adverse impacts on upstream or downstream environments. Stormwater runoff from both pre and
   post-development scenarios will be calculated and the results analysed and possible solutions proposed.


   6.1      Catchment Analysis
   The total proposed development area is 2,448m² (0.248 Ha). Details of the pre-development catchment are
   shown in Table 2 below, which shows the surface types, areas, percentage imperviousness and fraction
   impervious.


   Table 2: Pre-development catchment characteristics

           Surface Type                Area (m²)        Percentage Imperviousness                    Fraction impervious
         Roof and Paved                    0                              100
              Area                                                                                           0.00
         Landscaped Area                 2,448                              0


   Details of the post-development catchment are shown in Table 3 below, which shows the surface types, areas,
   percentage imperviousness and fraction impervious.


   Table 3:Post-development catchment characteristics

           Surface Type                Area (m²)        Percentage Imperviousness                    Fraction impervious
         Roof and Paved                  1,673                            100
              Area                                                                                           0.68
         Landscaped Area                  775                               0


   Tables 2 and 3 above show that the fraction impervious for the post-development case is higher than the fraction
   impervious of the pre-development case, this will result in increased peak flows in the post-development case
   therefore onsite stormwater detention is required.


   6.2      Stormwater Detention Sizing


   6.2.1      Rational Method
   The rational method was used to calculate the stormwater runoff flows from the site for the pre and post-
   development scenarios. The formula is as follows:


              Qy = (2.78 * 10-3)) Cy*A* tIy                                     (QUDM 2007 Equation 4.02)



                            123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566                                    Page 4
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.