Appendix C - Stormwater Management Plan

Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TfA Project Group Pty Ltd                                                                  Stormwater Management Plan
                                                                                                Development Application


   4     FLOODING


   A Storm tide Information Map (Map 10-D34) obtained from the Noosa Council website states that the site is outside
   the known floodplain extent. Refer to Appendix C for the Noosa Council’s Stormtide Information Map 10-D34 –
   September 2012. A close up of the Map showing the development site highlighted is shown in Figure 2 below.


   Figure 2: Close up of the Stormtide Information Map 10-D34 showing the development site (in red)




   5      PROPOSED DRAINAGE LAYOUT


   The post development stormwater drainage design generally maintains the overall catchment boundary, the design
   separates the high risk (hydrocarbon generating e.g. under the canopy) area from the low risk areas (the rest of
   the site). Any spillage or minor spills from under the canopy will be captured by grated gully pits and directed to a
   Spel® Puraceptor for hydrocarbon removal, which then discharges to the stormwater network. The fuel delivery fill
   point (unloading area) will be located under the canopy and any spills that might occur during unloading will be
   directed to the Spel® Puraceptor. A licensed contractor will remove the contents of the Puraceptor when required.


   Stormwater runoff generated from low risk areas (the rest of the site) will be captured and conveyed by gully pits
   and underground pipes, which then discharge to the legal point of discharge on Eumundi Noosa Road. All the
   stormwater runoff generated from low risk areas on the site will be treated using Spel® Stormsacks. Refer to
   Appendix E for a concept plan of the stormwater drainage and site grading.


                            123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566                             Page 3
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.