Appendix C - Stormwater Management Plan

Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TfA Project Group Pty Ltd                                                                                 Stormwater Management Plan
                                                                                                               Development Application




   Table 6: Fy factors for the nominated ARI’s

                1 year ARI       2 year ARI           5 year ARI         10 year ARI      20 year ARI     50 year ARI         100 year ARI
                 (mm/hr)            (mm/hr)              (mm/hr)          (mm/hr)          (mm/hr)           (mm/hr)               (mm/hr)
      Fy           0.80                0.85               0.95              1.00             1.05               1.15                1.20


   The coefficient of discharge for both pre and post-development catchments is calculated based on equation 4.05
   of QUDM and the results shown in Table 7.


   Table 7: Coefficients of discharge for pre and post-development scenarios

           Coefficient of Discharge              1 year      2 year          5 year       10 year        20 year         50 year     100 year
                                                  ARI            ARI          ARI           ARI           ARI             ARI          ARI
      Pre-development Catchment                   0.56           0.60        0.67          0.70           0.74            0.81         0.84
     Post-development Catchment                   0.67           0.71        0.80          0.84           0.88            0.97         1.01


   6.2.5        Rainfall Intensities
   The rainfall intensities for the site were read from an IFD table obtained from the BOM website for the project site
   on 25 September 2015. The rainfall intensities for a given time of concentration for the pre and post-development
   cases for the nominated ARI’s are shown in Tables 8 and 9.


   Table 8: Rainfall intensities for the nominated ARI’s for the pre-development scenario

           tc      1 year ARI          2 year ARI        5 year ARI       10 year ARI      20 year ARI      50 year ARI          100 year ARI
      (mins)         (mm/hr)            (mm/hr)           (mm/hr)           (mm/hr)          (mm/hr)            (mm/hr)             (mm/hr)
        10             99.3               126               156               173              196                 227                250


   Table 9: Rainfall intensities for the nominated ARI’s for the post-development scenario

           tc      1 year ARI          2 year ARI        5 year ARI       10 year ARI      20 year ARI      50 year ARI          100 year ARI
      (mins)         (mm/hr)            (mm/hr)           (mm/hr)           (mm/hr)          (mm/hr)            (mm/hr)             (mm/hr)
       6.0             121                154               189               210              238                 275                302


   6.2.6        Stormwater Design Flows
   Table 10 shows the stormwater runoff flows for the pre-development case calculated using the rational method.


   Table 10: Stormwater flows generated by the pre-development catchment

      Catchment             Q1 (l/s)          Q2 (l/s)       Q5 (l/s)         Q10 (l/s)      Q20 (l/s)        Q50 (l/s)            Q100 (l/s)
      A (QoutPC)            37.78             50.94              70.48          82.28          97.88             124.16              142.68


   Table 11 shows the stormwater runoff flows for the post-development case calculated using the rational method.




                            123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566                                               Page 6
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.