Original PDF page 13, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TfA Project Group Pty Ltd                                                                                 Stormwater Management Plan
                                                                                                               Development Application


   Table 11: Stormwater flows generated by the post-development catchment

      Catchment             Q1 (l/s)        Q2 (l/s)        Q5 (l/s)        Q10 (l/s)       Q20 (l/s)         Q50 (l/s)        Q100 (l/s)
        A (Qin)              55.25           74.71           102.47          119.85          142.62            180.49           260.83


   As can be seen from Table 12 below, the development will increase stormwater runoff for the catchment for the
   nominated ARI’s, therefore onsite stormwater detention will be required to mitigate the peak discharge and achieve
   the “no worsening” of the stormwater drainage conditions external to the site.


   Table 12: Stormwater flow differences between post and pre-development for standard ARI’s

     Change in Flow            Q1 (l/s)         Q2 (l/s)        Q5 (l/s)        Q10 (l/s)       Q20 (l/s)        Q50 (l/s)      Q100 (l/s)
              A                    17.46         23.77           31.99            37.57           44.74            56.34          64.15


   Stormwater runoff from the back of the proposed building at the Southern area (390 m2) of the site will flow
   unmitigated by passing detention. A gully pit will convey the runoff and will discharge the flow to the legal point of
   discharge on Walter Hay Drive. Table 13 shows the stormwater flow generated by the bypassing area.

   Table 13: Stormwater runoff bypassing the detention basin for the post-development catchment

     Catchment         Q1 (l/s)            Q2 (l/s)        Q5 (l/s)        Q10 (l/s)        Q20 (l/s)         Q50 (l/s)        Q100 (l/s)
      A (QoutL)             8.82           11.92           16.35            19.13            22.76              28.80            33.00


   The adjusted allowable discharge from the detention basin is shown in Table 14 below.

                                                           Qout = QoutPC – QoutL



   Table 14: Allowable stormwater discharge from the detention basin

      Catchment              Q1 (l/s)         Q2 (l/s)        Q5 (l/s)        Q10 (l/s)       Q20 (l/s)        Q50 (l/s)       Q100 (l/s)
      A (QoutPC)             37.78             50.94           70.48            82.28           97.88           124.16          142.68
       A (QoutL)              8.82             11.92           16.35            19.13           22.76            28.80           33.00
       A (Qout)              28.97             39.02           54.13            63.15           75.12            95.35          109.68


   6.2.7      Required Detention Volume


   The onsite detention volume will restrict the post-development flows to pre–development levels. The required
   detention volumes were estimated using the equation 5.04 (After Basha 1994), outlined in Section 5.05.1 of
   QUDM (2007). Table 15 shows post-development flow rates, allowable discharges from the detention basin(s),
   and the detention storage volume required to achieve the “no-worsening” of the drainage conditions external to
   the development site for the nominated ARI’s.




                            123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566                                            Page 7
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.