Log in to see the plans as drawnTfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Table 11: Stormwater flows generated by the post-development catchment
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (Qin) 55.25 74.71 102.47 119.85 142.62 180.49 260.83
As can be seen from Table 12 below, the development will increase stormwater runoff for the catchment for the
nominated ARI’s, therefore onsite stormwater detention will be required to mitigate the peak discharge and achieve
the “no worsening” of the stormwater drainage conditions external to the site.
Table 12: Stormwater flow differences between post and pre-development for standard ARI’s
Change in Flow Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A 17.46 23.77 31.99 37.57 44.74 56.34 64.15
Stormwater runoff from the back of the proposed building at the Southern area (390 m2) of the site will flow
unmitigated by passing detention. A gully pit will convey the runoff and will discharge the flow to the legal point of
discharge on Walter Hay Drive. Table 13 shows the stormwater flow generated by the bypassing area.
Table 13: Stormwater runoff bypassing the detention basin for the post-development catchment
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (QoutL) 8.82 11.92 16.35 19.13 22.76 28.80 33.00
The adjusted allowable discharge from the detention basin is shown in Table 14 below.
Qout = QoutPC – QoutL
Table 14: Allowable stormwater discharge from the detention basin
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (QoutPC) 37.78 50.94 70.48 82.28 97.88 124.16 142.68
A (QoutL) 8.82 11.92 16.35 19.13 22.76 28.80 33.00
A (Qout) 28.97 39.02 54.13 63.15 75.12 95.35 109.68
6.2.7 Required Detention Volume
The onsite detention volume will restrict the post-development flows to pre–development levels. The required
detention volumes were estimated using the equation 5.04 (After Basha 1994), outlined in Section 5.05.1 of
QUDM (2007). Table 15 shows post-development flow rates, allowable discharges from the detention basin(s),
and the detention storage volume required to achieve the “no-worsening” of the drainage conditions external to
the development site for the nominated ARI’s.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.