Traffic Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
REFERENCE TABLES FOR VARIOUS PURPOSES WITH ADOPTED CRITERIA
FOR THIS WORKSITE HIGHLIGHTED IN YELLOW
Table 4.2 – Value of D TABLE 3.7 - RECOMMENDED MAX SPACING OF CONES AND BOLLARDS
Posted speed in km/h Dimension D (m) Purpose and usage Speed limit (km/h) Recommended
(prior to roadworks) maximum spacing
40 or less 5 to 10 (m)
50 10 to 15 All purposes <50 4
60 15 to 45 Closure >70 12
70, 80 60 to 80 Taper >70 9
90, 100 90 to 100
110 100 to 120 TABLE 4.1 - WORKS PROTECTION METHODS
Works Applicable Tasks MUTCD ADOPTED
Method Ref METHOD
Static All works which are Clause
Recommended taper lengths (Table 4.6) work site greater in scope and 4.2
Permanent Recommended taper lengths (m) duration than can be
posted speed Traffic Control at Lateral shift Merge taper handled by the short ADOPTED
(km/h) beginning of taper taper term, low impact
40 or less 15 5 15 provisions listed below or
50 15 15 30 mobile works
60 30 30 60 Short Isolated work on Clause
70 30 60 - 80 120 - 160 term, low pavements of up to 5 min 4.3
80 30 60 - 80 120 - 160 impact duration, traffic volumes NOT
90 30 60 - 80 120 - 160 works – permitting. Shoulder ADOPTED
open road grading and verge
100 30 60 - 80 120 - 160
areas mowing
> than 100 30 60 - 80 120 - 160
Short Work adjacent to or in a Clause
term, low traffic lane of duration 5 4.4
impact min to work 1 hour
works – depending on traffic NOT
built up volume. Median and ADOPTED
areas verge mowing, footpath
Table 4.11 - Minimum Lane Widths works
Works on Maintenance grading. Clause NOT
Posted speed limit during road works Minimum lane widths (m)
unsealed Short term partial road 4.5 ADOPTED
(km/h)
roads closures
60 or less 3.0
Mobile Line marking, pavement Clause
70 to 90 3.2
Works marker laying or removal, 4.6
Greater than 90 3.4
pavement testing where
all signs and other NOT
protective devices are ADOPTED
TABLE 4.7 - GUIDE TO THE SELECTION OF ROADWORKS SPEED LIMITS carried on vehicles
40Km/H Worker safety – Workers on foot are working within 1.2m of
traffic with no intervening physical protection
Traffic Safety – There would be structural danger to bridges at
higher speeds (1km maximum length)
60Km/H Workers Safety – Workers on foot or operating plant are within
3m of the trafficable area with no intervening
physical barrier
- A traffic controller is being used in advance of
portable or temporary traffic signals
- Dust or smoke may reduce visibility
Traffic Safety – Traffic is subjected to a reduced standard
alignment due to the works
- The pavement surface has been degraded
- A bituminous seal has just been laid
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Traffic Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.