GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
CD-001 J Vegetation Management Plan, prepared by 2021.05.28
Project Urban
CD-002 L Landscape Plan – In Ground, prepared by 2021.05.28
Project Urban
CD-003 K Landscape Plan – In Ground, prepared by 2021.01.25
Project Urban
CD-004 I Landscape Plan – On Podium, prepared by 2021.01.25
Project Urban
CD-005 I Landscape Plan – Boundary Fences, 2021.01.25
prepared by Project Urban
CD-200 L Construction Details, prepared by Project 2021.01.25
Urban
CD-201 C Planting Schedule, prepared by Project 2021.01.28
Urban
CD-202 B Planting Schedule, prepared by Project 2021.07.07
Urban
CURRENCY PERIOD
59. The Currency Period for this development approval lapses if the development has not
substantially started by 17 February 2024, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
60. All necessary approvals from external service providers (e.g. Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
61. A condition report of the drainage system must be completed for agreement prior to
the prestart meeting. The condition report is to include a CCTV inspection of the
existing pipe and must include at least 50m upstream and downstream of all works.
62. A condition report including photographs of the frontage of the site must be completed
and submitted to council prior to the prestart meeting.
63. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council prior to the prestart meeting.
64. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500.
The pre-start meeting must include the relevant parties for the following aspects of the
works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
65. A Construction Management Plan must be submitted to Council prior to the pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased;
Page 18 of 26