GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
iii. Proposed fencing to the site during the construction phase of the
development;
iv. Adequate parking arrangements for construction workers;
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures;
c. Provision for safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
d. Works programme identifying key components of the works and their respective
durations;
e. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues;
f. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
g. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details;
h. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures;
i. For haulage operations involving significant volumes of excavated material being
transported off the site: details on the location of external site, the haulage route,
type of vehicle to be utilised during excavation operations and frequency of
usage. NB any damage to the existing road system as a result of haulage
operations must be fully repaired at the applicant’s expense.
66. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five business
days of the change occurring.
67. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
DURING CONSTRUCTION
Engineering
68. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal works
are involved, such confirmation must be submitted for the respective hold points prior
to any site inspection by Council Officers.
69. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines;
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
Page 19 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.