PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 11 NOVEMBER 2014
Landscaping
7. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and The Noosa Plan’s Planning
Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must
include:
a. The landscaped areas as generally shown on the approved Site Plan, except
where amended by conditions contained herein.
b. Trees within the front setback area and to soften building bulk.
c. All plantings near storm water infrastructure are to be coordinated with the
approved hydraulics plans and must not interfere with the operational function of
the storm water devices, either by root interference, shading or other means.
d. Landscaping plans must show the location of all water quality devices.
e. Retention of existing street trees.
8. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Street Identification
9. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
ENGINEERING
Carparking and Driveways
11. Sealed car parking and access driveway must be provided generally in accordance
with Drawing No: S8166 – MS01- Revision (A) titled Master Site Plan dated
20/08/2014 by Milanovic Neale Consulting Engineers. The works must be undertaken
in accordance with an Operational Works approval and must include in particular:
a. The car parking must be in compliance with the provisions of the current AS/NZS
2890.1 off-street car parking (particularly Section 2.4.4) and the relevant sections
of AS/NZS 2890.6 off-street car parking for people with disabilities.
b. Compliance with the relevant sections of AS/ANZ 2890.2 Off-street commercial
vehicles facilities.
c. Traffic control and directional signage within and at the entry of the site must be
provided in accordance with the design engineer recommendations and in
compliance with the Manual of Uniform Traffic Control Devices (MUTCD).
12. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Page 35 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.