230518 Hofmann CMP
1.3 Interface with other Project Plans and Procedures
The CMP forms part of an integrated set of Project Management Plans and should be read in conjunction with
these plans.
1.4 Document Control
Amendments to this CMP are approved by the Project Manager and authorized for distribution to all holders of
controlled copies.
DATE NAME OF RECIPIENT ORGANISATION
…./…./…. Michael Michell Acceler Project Management
Uncontrolled hard copies of this plan may be distributed to key personnel and key stakeholders. These copies are
not subject to automatic amendment and the receiver should verify the currency of the document. Revisions to this
Management Plan will be made as required to reflect the current system requirements.
REV DATE DESCRIPTION PAGE REVIEWED BY APPROVED BY
1 May 2023 Construction Management Plan – Draft MM MM
4