1.3      Interface with other Project Plans and Procedures
The CMP forms part of an integrated set of Project Management Plans and should be read in conjunction with
these plans.


1.4      Document Control
Amendments to this CMP are approved by the Project Manager and authorized for distribution to all holders of
controlled copies.

 DATE               NAME OF RECIPIENT       ORGANISATION

 …./…./….           Michael Michell         Acceler Project Management


Uncontrolled hard copies of this plan may be distributed to key personnel and key stakeholders. These copies are
not subject to automatic amendment and the receiver should verify the currency of the document. Revisions to this
Management Plan will be made as required to reflect the current system requirements.

 REV     DATE         DESCRIPTION                                        PAGE    REVIEWED BY      APPROVED BY

 1       May 2023     Construction Management Plan – Draft                       MM               MM




                                                                                                                    4
Log in to download the original file

230518 Hofmann CMP.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.