Original source · versioned page text
230518 Hofmann CMP
2. Proposed Site
2.1 Site Description
The site, adjacent to Hoffman Drive Noosaville and has a single frontage.
Figure 1Site and Adjoining Roads
2.2 Site Constraints
The site has very few site constraints from the point of view of surrounding road networks and
neighbors however there are a few internal constraints that will need to be considered.
There is a shared access road to the front of the site which is being reconfigured during the
building process. Consultation and coordination with surrounding stakeholders will be
required.
Power supply upgrades will be a requirement for the site and will involve some works by
Energex outside the boundaries of the site and additional works within the site.
There is an existing building on the Southern Boundary which will require protection and
supervision during the construction phase.
There is a vacant lot to the Southern Boundary. Any access to this site shall be approved by
the landowners prior to any access or use.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original