         There are existing properties to the West of the site separated by a link mesh fence.




 2.3         Adjoining and Neighboring Properties
 Careful site management, which will minimize disruption and inconvenience to neighboring buildings
 and their occupants, is of the highest importance. The Main Contractor will be required to provide 2
 points of contact to work with neighbors to understand their needs and requirements, and, where
 possible, adjust construction works methodologies accordingly.

 Also refer to Section 5.0 - Adjoining Owners Management


 2.4         Proposed Development
 The proposed redevelopment comprises a 2-storey building including;

          Car parking
          BOH Facilities
          Commercial tenancies to ground Floor and Upper Floor
          Plant and Equipment Decks
          Extensive Landscaping

 The total site area is 7920m2 and the total building Gross Floor Area is 3,800m2


 2.5         Key Items
 Whilst preparing this Preliminary CMP Acceler Project Management has identified the following key items
 and attributes:
         Site works will require minor earthworks to the site, ground floor RL’s have considered the natural
          topography of the site to minimize bulk earthworks.
         A new Pad Mount Transformer is currently being discussed with Energex for power supply
          requirements for the site.
         Work vehicle access and egress into the site will need to be considered by both the Principal
          Contractor and the Civil Sub-Contractor


 3.          Proposed Construction Methodology
 3.1         Hours of Work
 General construction works will be undertaken within the hours permitted under the development
 approval. In some cases, after-hours permits may be sought from the relevant authorities where special
 requirements exist, for example oversized deliveries, crane installation and/or demobilization.
 Working hours are foreseen as follows:
         Between 6:30am – 6:00pm (upon issue of Conditions of consent) - Monday to Friday
         Between 6:30am – 6:00pm (upon issue of Conditions of consent) – Saturday

The council will provide further guidance for working times upon Operational Works approval issue.




                                                                                                                6
Log in to download the original file

230518 Hofmann CMP.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.