230518 Hofmann CMP
There are existing properties to the West of the site separated by a link mesh fence.
2.3 Adjoining and Neighboring Properties
Careful site management, which will minimize disruption and inconvenience to neighboring buildings
and their occupants, is of the highest importance. The Main Contractor will be required to provide 2
points of contact to work with neighbors to understand their needs and requirements, and, where
possible, adjust construction works methodologies accordingly.
Also refer to Section 5.0 - Adjoining Owners Management
2.4 Proposed Development
The proposed redevelopment comprises a 2-storey building including;
Car parking
BOH Facilities
Commercial tenancies to ground Floor and Upper Floor
Plant and Equipment Decks
Extensive Landscaping
The total site area is 7920m2 and the total building Gross Floor Area is 3,800m2
2.5 Key Items
Whilst preparing this Preliminary CMP Acceler Project Management has identified the following key items
and attributes:
Site works will require minor earthworks to the site, ground floor RL’s have considered the natural
topography of the site to minimize bulk earthworks.
A new Pad Mount Transformer is currently being discussed with Energex for power supply
requirements for the site.
Work vehicle access and egress into the site will need to be considered by both the Principal
Contractor and the Civil Sub-Contractor
3. Proposed Construction Methodology
3.1 Hours of Work
General construction works will be undertaken within the hours permitted under the development
approval. In some cases, after-hours permits may be sought from the relevant authorities where special
requirements exist, for example oversized deliveries, crane installation and/or demobilization.
Working hours are foreseen as follows:
Between 6:30am – 6:00pm (upon issue of Conditions of consent) - Monday to Friday
Between 6:30am – 6:00pm (upon issue of Conditions of consent) – Saturday
The council will provide further guidance for working times upon Operational Works approval issue.
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original