Minor Change Existing Approval 132006 272 01 (3) · 132006.272.01
Headworks Contributions
37. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contributions rats under the currently policies is outlined below. These amounts
will adjust in line with changes to the Co0nsumer Price Index, All Groups Brisbane from
March 2006 until date of payment.
Water Supply $4,465
Sewerage $2,053
TOTAL $6,518
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively, a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use3 of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
38. Earthworks carried out on sire shall not affect existing Council sewer mains or the structural
integrity of any of the existing fence and/or structure that border the development site.
Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate
of classification. In this regard any fences to be re4placed shall be clearly shown on the
plans submitted for Operational Works approval.
Site Stability
39. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect
existing Council sewer mains, the stability of adjoining buildings and/or structures and/or
land, and make recommendations on the type of foundation system(s) best suited for the
proposed development. The recommendations of this report shall be incorporated into the
design and construction of the proposed development.
40. A Geotechnical Engineer or similar qualified expert shall certify that the existing site and soil
conditions are suitable to cater for the proposed stormwater infiltration without adversely
affecting the downstream properties and existing Council sewer mains. This certification
shall be submitted to Council prior to the issue of any Operational Works approval.
Erosion and Sediment Control
41. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operation Works.
General
42. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction with an
application for Development Permit for Operation Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with
any application for Operational Works.
Page 6 of 11
Document Set ID: 23339788
Version: 3, Version Date: 08/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132006 272 01 (3).pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.