PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
18. Prior to the commencement of the use certification must be submitted to Council from a
qualified person* which certifies that the development has been constructed in accordance
with the recommendations of the Geotechnical and Slope Stability Investigation prepared
by Coffey Geotechnics reference GEOTKPAR01945AA/A dated 23 April 2013 and that the
development has a minimum factor of safety against landslip of 1.5 in the long term.
Damage to Services and Assets
19. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Stormwater Drainage
20. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The stormwater drainage system must be provided in accordance with a
revised Stormwater Management Plan and implemented at all times during the use and
include:
a. Water Quality treatment strategies to treat runoff from roofs and roads generally in
accordance with the Stormwater Quality Catchment Layout Plans, prepared by
Callaghan & Toth dated 10/2015. Water Quality treatment strategies for runoff from
these areas must be designed and installed in accordance with latest version of the
Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, including any other bunds or chemical storage requirements required by
this approval and maintained for the lifetime of the development in accordance with
relevant Water by Design maintenance guidelines.
b. Erosion and Sediment control strategies for the construction and runoff from
hardstand areas are to be designed and managed in accordance with the
International Erosion Control Association Best Practice Book Series, and certified by
an RPEQ/CPESC to ensure that concentrated runoff discharged from the site will not
result in erosion, scour or entrainment of sediments at its overflow path.
A development application for Operational Works shall be required in this regard.
ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4): POULTRY FARMING
SCHEDULE A - GENERAL
1. This development approval authorises the conduct of environmentally relevant activity 4 -
Poultry Farming (2) more than 200,000 birds.
2. This development approval does not authorise the conduct of any other environmentally
relevant activity on site.
3. Environmental harm is not authorised by this Authority except to the extent that the harm is
expressly authorised by a condition of this Authority.
4. The holder of the relevant environmental authority must keep a copy of the development
approval conditions for the activity in a location readily accessible to personnel carrying out
this activity.
5. The registered operator must ensure that the activities at the premises comply with the
development approval conditions.
Page 24 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.