Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2015-11-10 Planning & Organisation Committee Agenda

of 187

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             10 NOVEMBER 2015


6.    The registered operator must not change, replace or operate any plant or equipment
      installed at the premises if the change, replacement or operation increases, or is likely to
      substantially increase, the risk of environmental harm.
7.    Any visible light released from the environmentally relevant activity must be of the
      appropriate type, and positioned to ensure spill and obtrusive light does not exceed the
      recommended maximum values of AS 4282-1997 ‘Control of the obtrusive effects of
      outdoor lighting’ Table 2.1 & 2.2 so as not to cause an environmental nuisance at or
      beyond the boundary of the approved development.
8.    The Operator must keep all records and documents required to be kept by a condition of
      this Development Approval at the Premises for a period of not less than 12 months and
      make the records and documents available for examination by an Authorised Person
      immediately upon request.
9.    Copies of any record required by a condition of this development approval must be
      provided to any authorised person or the administering authority on request.
10.   In carrying out the environmentally relevant activity, all reasonable and practical measures
      must be implemented to minimise releases and the likelihood of releases of contaminants
      to the environment, except as otherwise provided by the conditions of this development
      approval.
11.   The operator of the environmentally relevant activity must:
      a.    Install, maintain and operate plant and equipment in a proper and efficient condition.
            In this condition, “plant and equipment” includes:
            i.     Plant and equipment used to prevent and/or minimise the likelihood of
                   environmental harm being caused;
            ii.    Devices and structures to contain foreseeable escapes of contaminants and
                   waste;
            iii.   Vehicles used to transport waste:
            iv.    Devices and structures used to store, handle, treat and dispose of waste;
            v.     Monitoring equipment and associated alarms; and
            vi.    Backup systems that act in the event of failure of a primary system.
12.   Material safety data sheets for all chemicals used and/or stored on the premises must be
      kept on site and be readily available for reference by staff.
13.   All trafficable areas on site must be sealed.
SCHEDULE B - SITE SPECIFIC
14.   Within three (3) months of the granting of this development approval, the operator must
      develop and implement a Site Based Management Plan (SBMP) that addresses the
      management of environmental impacts of the activities under this approval. The SBMP
      must identify all potential sources of environmental harm, including but not limited to the
      actual and potential release of all contaminants, the potential impact of these sources and
      what actions will be taken to prevent the likelihood of environmental harm being caused.
      The SBMP must also provide for the review and 'continual improvement' in the overall
      environmental performance of all activities that are carried out.
      The SBMP must address (but not be limited to) the following matters:
          Environmental commitments - a commitment by senior management to achieve
            specified and relevant environmental goals;
          Organisational structure, responsibilities and effective communication;
          Identification of environmental issues and potential impacts;


                                                                                   Page 25 of 201
Log in to download the original file

2015-11-10 Planning & Organisation Committee Agenda(PDF, 15MB).pdf · 15.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.