Appendix E - Construction Management Plan.pdf

of 127
                                                 Environmental Management Plan
                                                                  MANAGEMENT SYSTEMS
                                                                             Eff. Date:
                                                                                              Rev.: E              Pg. 7 of 20
                                                                            15/07/2020

                    2.0 ASPECT / TERMINATION REGISTER
Category/Activity        Aspect           Potential              Risk Rating                      Target                               Actions and Controls                     Residual
                                        Impact/Risks                                                                                                                              Risk
                                                             C   P      Initial Risk

Air Quality
                                    •   Erosion of soil.     2   B             H       •   No major incidents or       •   Monitor and manage the incidence of dust                L
                     Dust           •   Discomfort to site
                                                                                           infringement notices.           deposition from construction activities and
                                                                                                                           construction vehicles.
                                        personnel and                                  •   Implement dust
                                        neighboring                                        suppression mechanisms      •   Apply water sprays* as required during periods of
                                        properties or                                      to ensure a low or zero         dry weather, strong winds or dust generating
                                        persons.                                           impact on site personnel,       activities.
                                                                                           site activities and         •   Minimise dust generating construction activities
                                                                                           surrounding environs.           during periods of high winds or adverse weather.
                                                                                                                       •   Ensure that subcontract personnel adopt work
                                                                                                                           methods to include dust minimisation practices.
                                                                                                                       •   As required, implement regular sweeping
                                                                                                                           (including road sweeping) and cleaning activities.
                                                                                                                       •   Vegetate, cover and/or dampen* stockpiles.
                                                                                                                       •   Implement corrective action in response to
                                                                                                                           diminished air quality as a consequence of
                                                                                                                           construction activities or vehicles.
                                                                                                                       •   Daily inspections and inspections following a
                                                                                                                           major weather event (i.e. storm, high wind).
                                                                                                                       •   *non-potable water (i.e. recycled water) must be
                                                                                                                           used to complete this activity.

                                    •   Air pollution and    1   C             L       •   No plant or equipment       •   Implement a plant inspection schedule at arrival        L
                     Plant              discomfort to site                                 blowing visible smoke for       on site and during completion of site activities.
                                        personnel.                                         longer than 10 seconds
                     Emissions                                                             after applying power.
                                                                                                                       •   Consider the use of electric plant and catalytic
                                                                                                                           converters where plant is to be used in confined
                                                                                                                           spaces.
                                                                                                                       •   Completion of applicable plant or equipment
                                                                                                                           checklist at arrival of plant on site and before
                                                                                                                           commencement of works.
                                                                                                                       •   Daily inspections of operating Plant.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.