Appendix E - Construction Management Plan.pdf
Environmental Management Plan
MANAGEMENT SYSTEMS
Eff. Date:
Rev.: E Pg. 8 of 20
15/07/2020
Category/Activity Aspect Potential Impact/Risks Risk Rating Target Actions and Controls Residual
Risk
C P Initial
Risk
Contaminated
• Environmental pollution. 2 C M • Removal of contaminated • Review available source documentation (i.e. Geo- L
material
Soil • Health hazards to site
soil with zero technical Report) to determine project environmental
environmental or health consideration and potential control methods.
(i.e. PASS) personnel and other impacts to personnel or
non-construction the ecosystem. • Develop a Management Plan (CMP) which
personnel. incorporates recommended control, methods for
contaminated soils (i.e. PASS) and ensure that all
• Working with a site personnel abide by the content of the plan.
Hazardous Substance.
• Complete work in accordance with DA/BA, WH&S
and EPA legislative requirements.
• Ensure that appropriate SWMS have been supplied
and approved for use.
• Ensure that only accredited companies are involved
in the removal and disposal process.
• As required, ensure that an accredited person
inspects and certifies that the area is free of
contaminates.
• Ensure that only personnel directly associated with
the works are permitted into the work area.
• Loss, damage, or harm 3 C H • No damage or harm to the • Compliance with the BBN Constructions RIFA L
Fire Ants to local and/or protected ecosystem. Management Plan.
flora and fauna.
• Nil infringements. • Inspections per the BBN Constructions RIFA
• Spread of the pest into Management Plan.
other non-contaminated
areas.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.