                                               Environmental Management Plan
                                                                    MANAGEMENT SYSTEMS
                                                                                 Eff. Date:
                                                                                                     Rev.: E                 Pg. 9 of 20
                                                                                15/07/2020


 Category/Activity      Aspect         Potential Impact/Risks           Risk Rating                   Target                                   Actions and Controls                       Residual
                                                                                                                                                                                            Risk
                                                                    C      P     Initial
                                                                                  Risk

Construction
                                   •     Decrease in air and        3      D          M    •   No damage to surrounding        •   Clearing methods to follow procedures, which              L
Activities
                     Vegetation          water quality.                                        ecosystem.                          incorporate acceptable erosion and stormwater
                                                                                                                                   control management.
                     clearing      •     Buildup of sediment in                            •   Sediment and erosion
                                         water systems.                                        does not exceed natural         •   No burning off-on site.
                                                                                               rates.                          •   Contractors required to remove sediment distributed
                                                                                           •   Nil complaints or                   by vehicles on any road areas (i.e. using sweeper
                                                                                               infringements.                      trucks).
                                                                                                                               •   Appropriate control measures to be installed to
                                                                                                                                   ensure containment of disturbed areas and
                                                                                                                                   stockpiles.
                                                                                                                               •   Limited disturbance of ground covers to required
                                                                                                                                   excavation areas.
                                                                                                                               •   Stockpiling of excavated material into areas which
                                                                                                                                   have no impact on the eco system.
                                                                                                                               •   Stockpiles vegetated (where practicable) to improve
                                                                                                                                   soil stability.
                                                                                                                               •   Daily inspections and inspections following a major
                                                                                                                                   weather event (i.e. storm, high wind).




                                   •     Dust emissions which       2      C          M    •   Compliance with legislative     •   Develop or implement an Erosion and Sediment              L
                     Erosion and         degrade air quality.                                  requirements.                       Plan which identifies stockpile areas and control
                                                                                                                                   methods to mitigate against erosion and sediment
                     sediment      •     Degradation of water                              •   Zero infringement notices           creation.
                                         from contamination of                                 or complaints.
                                         watercourses through                                                                  •   Ensure that the handling and placement of
                                         silt and sediment build-                                                                  excavated material is in accordance with SWMS,
                                         up.                                                                                       Client instructions, EPA requirements etc.
                                                                                                                               •   Install erosion and sediment control devices to
                                                                                                                                   mitigate and manage the impact of excess soils on
                                                                                                                                   surface water quality, air quality, fauna and flora.
                                                                                                                               •   Complete daily inspections of stockpiles, excavated
                                                                                                                                   areas and control methods for erosion and sediment
                                                                                                                                   management.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.