Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
CONSIDERED OPTIONS –: Surface correction phase. Short term impact to through traffic.
TMD: Dennis Miles
On Road Traffic (Light vehicles incl. with trailers, motor cyclists, delivery vans, etc)
Option Analysis Decision
Traffic through the Worksite Insufficient room for construction activities
Not Used
(QGTTM Part 3 Section 4) Does not satisfy worker separation requirements
Construction activity or activity safety zone or
delivery encroaches to within 200mm of travel
Traffic past the Worksite path.
Not Used
(QGTTM Part 3 Section 5) Does not satisfy worker separation requirements
Allows long term hoarding of equipment when
placed behind a suitable barrier system
Full road width needed to allow safe process to
be completed
Satisfies worker separation requirements
Allows adequate separation between public and
Detour Optimal Treatment
site vehicles
Site vehicle access and residential access to
within Workzone to be controlled by traffic
Traffic around the Worksite: control.
ROAD CLOSURE/DETOUR Unnecessary for the scope of works
(QGTTM Part 3 Section 2 insufficient area for construction of side track due
Harmonised) Side-track to urban environment Not Used
insufficient area for construction of side track due
to interference with utility services
Additional construction works required to
facilitate contraflow
Contraflow Additional unwarranted negative impact on Not Used
network
inconsistent with minimal lane requirements
Pedestrians ( Established footpaths. School children, disabled, families and pets, postal services)
Option Analysis Decision
Existing pathway on the Eastern side of the
Elanda Street terminates at Northern boundary of
construction area.
Pedestrians then diverted across the street using
existing driveways and ramps.
Leave on footpath Optimal Treatment
Temporary pedestrian ramp to be installed on
Pacific Avenue.
Pedestrians to be diverted across Pacific avenue
when access across Elanda street from East to
west is impeded by construction works.
insufficient area for construction of side track due
to urban environment
Divert (Side-track) Not Used
insufficient area for construction of side track due
to interference with utility services
Shared Pathway north of Queen of colonies Pde
Detour Not Used
unaffected by scope of works.
MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 31 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.