Water Quality
57. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
the latest version of the Water Sensitive Urban Design Technical Design
Guidelines for South East Queensland, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in Stormwater Management Plan, prepared by
MPN Consulting, dated 27th June 2022;
b. bioretention devices which:
i. demonstrate that Bio basin 1 is able to gravity drain to the existing
stormwater infrastructure on site. The outlet pipe grade must be a
minimum of 0.5% to ensure the bio basin is free draining.
i. are designed generally in accordance with the Bioretention Technical
Design Guidelines (Water by Design, 2012)
ii. are designed, where applicable, generally in accordance with IPWEQA
Standard Drawing No. DS-073, DS-075, DS-076, and DS-078
iii. are provided with a free-draining outlet from the sub-soil drainage
system
58. A maintenance manual is required to be prepared for the stormwater quality
treatment devices, rainwater tanks and basement pump out system for the
development. This manual is to be submitted to Council at Operational Works
stage for review.
59. Permanent educational signage must be erected to educate the residents of the
development about the function of the bioretention device(s). The dimensions,
standard, presentation and location of the educational signage must be in
accordance with an Operational Works approval.
60. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1).
The approved Operational Works drawings for the stormwater quality treatment
system and detailed life cycle costing of the system must be attached as an
addendum to this document. Records of all maintenance activities undertaken
must be kept and made available to Council upon request.
61. Any proposed Community Management Statement required for the development
must include Water by Design (2009) Maintaining Vegetated Stormwater Assets
(Version 1) and must include the full cost of maintaining the system in accordance
with Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
1). The cost of maintaining the system must be included in the proposed levies for
each unit owner.
Stormwater Drainage
62. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. the detention system generally as described in Stormwater Management
Plan, prepared by MPN Consulting, dated 27th June 2022;
b. the use of gravity stormwater drainage and not surcharge pits to the
maximum extent practicable. Surcharge pits may only be used where the
catchment is composed of roof surfaces only;
Page 25 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.