ORDINARY MEETING AGENDA 25 SEPTEMBER 2014
Stormwater Drainage
8. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. An interallotment drainage system extending from the boundary of Lot 1
to James Street;
b. the use of gravity stormwater drainage.
Electricity and Telecommunication Services
9. Reticulated electricity and telecommunication services must be provided to
each lot in accordance with an approval for Operational Works and the
standards and requirements of the relevant service provider.
10. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
11. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
12. An easement for drainage purposes must be registered against the title of
proposed Lot 2 in favour of Council over the land area identified as being below
the 1%AEP flood level on the subject site.
13. For the purpose of this permit the 1%AEP flood level means the 1%AEP level
as described in a current Flood Certificate issued by Council.
14. An easement for access and services purposes must be registered against the
title of the Lot 3 SP155477 in favour of proposed Lots 1 and 2. The easement
must be located generally in accordance with the approved plan and have a
minimum width of 10 metres.
15. An easement for interallotment drainage must be registered against the title of
proposed Lot 2 in favour of proposed Lot 1. The easement must extend from
the common boundary of Lots 1 and 2 to the James Street frontage.
16. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
17. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
19. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Page 26 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.