Original source · versioned page text
Appendix B - Code Assessment Report - 6-10 Diamond Street Cooroy - 21.12.18
Attached to the e-mail Commercial Business Type 1 Office, Retail Business Type 2 Shop & Salon & Multiple Housing Type 4 Conventional - 4 units (Architectural Plans & Code Assessment Report) - MCU19/0001.
located and designed in accordance with the Roadside Advertising presents well to the street and enhances
Guide, Department of Transport and Main Roads, 2013 the Diamond streetscape character.
Minimal advertising devices are proposed.
PO3 Road, pedestrian and bikeway bridges AO3.1 Road, pedestrian and bikeway bridges over a state-controlled Not Applicable
over a state-controlled road are designed and road include throw protection screens in accordance with section 4.9.3 No road or active transport bridges are
constructed to prevent projectiles from being of the Design Criteria for Bridges and Other Structures Manual, proposed.
thrown onto a state-controlled road. Department of Transport and Main Roads, 2018.
Filling, excavation and retaining structures
PO4 Filling and excavation does not interfere No acceptable outcome is prescribed. Complies
with, or result in damage to, infrastructure or The proposed mixed-use precinct and
services in a state-controlled road. associated filling, excavation and retaining
works will not interfere with or result in
damage to Diamond Street.
PO5 Filling, excavation, building foundations No acceptable outcome is prescribed. Complies
and retaining structures do not undermine, The proposed mixed-use precinct and
or cause subsidence of, a state-controlled associated filling, excavation and retaining
road. works will not interfere with or result in
damage to Diamond Street.
PO6 Filling, excavation, building foundations No acceptable outcome is prescribed. Complies
and retaining structures do not cause ground The proposed mixed-use precinct and
water disturbance in a state-controlled road. associated filling, excavation and retaining
works will not interfere with or result in
damage to Diamond Street.
PO7 Excavation, boring, piling, blasting or fill No acceptable outcome is prescribed. Complies
compaction during construction of a The proposed mixed-use precinct and
development does not result in ground associated filling, excavation and retaining
movement or vibration impacts that would works will not interfere with or result in
cause damage or nuisance to a state- damage to Diamond Street.
controlled road, road transport infrastructure
or road works.
PO8 Development involving the haulage of AO8.1 Fill, extracted material and spoil material is not transported to or Complies
fill, extracted material or excavated spoil from the development site on a state-controlled road. The proposed mixed-use precinct and
material exceeding 10,000 tonnes per year associated filling, excavation and retaining
does not damage the pavement of a state- works will not interfere with or result in
6-10 Diamond Street, COOROY 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.