Council archive · source document
Stormwater Technical Memo · MCU23/0096
Figure 2. Extent of Proposed Arts Centre (right) transposed on existing (left). Table 1. Estimated Surface-Split Breakdown. Note: the garden and green corridor attached to the proposed building are included in the area calculations. Surface-Split Existing Proposed Roof Area (m2) 0 1,200 Road/Pathway (m2) 1,200 0 Garden/Open Space (m2) 0 165 Total (m2) 1,200 1,365 4 HYDROLOGIC ANALYSIS In accordance with the Queensland Urban Drainage Manual, peak stormwater flows are calculated based on impervious fractions. As shown in Table 2, the impervious fraction between the existing and proposed areas do not significantly change. This indicates that there will not be any significant changes to peak flows, and as such, detention is not required. Table 2. Impervious Fraction Estimate. Hydrological Assessment Existing Proposed Impervious Area (m2) 1,200 1,200 Impervious Fraction (%) 88 88 Technical Memo | 21-0211TM-SW01-v3 |Good Shepherd Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Technical Memo.pdfRelated documentApplication case desk ↗
About this file
- File size
- 517 KB (small file)
- File type
No other editions are linked here.