Original source · versioned page text
2022-09-12 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
9. Roof materials must be non-reflective and designed with colours and styles
to minimise the visual impact of the development.
10. The street awning must extend for the full width of the frontage and be
setback 1m from the face of the kerb. Amended plans must be submitted
prior to the issue of an operational works approval.
11. All ground floor shopfront glazing must be protected against vandalism by
the use of a form of safety glass such as toughened or laminated glass.
12. During operating hours, all parking areas, pedestrian areas and
entrances/exits to all stairwells, lifts, foyers and public toilets must be well
lit with vandal resistant lighting and with intensities to satisfy the
requirements of Australian Standard AS1158 “Public Lighting Code”.
Lighting must be designed to reduce the contrast between shadows and
well lit areas. In particular, appropriate security lighting must be provided
along the full length of the proposed pedestrian/cycleway.
Currency Period
13. This development approval lapses if the use has not happened by 15
September 2028 unless an application to extend the currency period is
approved by Council.
Building Height
14. The maximum height of the development must not exceed RL118.15 8m
to the peak of the roof line. as detailed on section B-B of Plan SK04.
15. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirement
of this Decision Notice.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum
of $10,000 must be submitted to Council, to secure performance of all
conditions of this approval, prior to the issue of a Development Permit for
Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Street Identification
17. The street address of the development must be clearly visible and
discernible from the primary frontage of the site by the provision of a street
number and, where appropriate, the building name.
External Works – Wimmers Lane
18. Wimmers Lane must be upgraded for the length of its frontage to the
subject site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. construction of kerb and channelling, road widening and underground
stormwater drainage to the development side only. The final extent
and alignment of works to be determined as part of the subsequent
Operational Works approval.
Road Widening of Wimmers Lane
19. The developer must dedicate as “road” a 2m wide strip extending across
the full frontage of the site to Wimmers Lane. The dedication must be in
Page 5 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.